Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000003 Review Comments Bond Estimate 2010-03-10 (3)
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Commonwealth Townhouses - Major Site Plan Amendment PROJECT NUMBER: WPO201000003 DATE OF ESTIMATE: 03/10/10 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1 1500 1500 SILT FENCE LF 200 5 1000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 480 3 1440 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 1 1000 1000 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 1 200 200 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 7840.00 project management 1176.00 subtotal 9016.00 CONTINGENCY LS 10% 901.60 TOTAL 9917.60 BOND AMOUNT REQUIRED 10000.00