Loading...
HomeMy WebLinkAboutWPO201000014 Review Comments Erosion Control Plan 2010-04-02� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Fulfillment Farm Wetland Restoration WPO201000014 Plan preparer: Austin Jamison — CWH [fax (410) 822 -4016] Owner or rep.: Wildlife Foundation of Virginia, Inc. [fax Unknown] Plan received date: 8 March 2010 Date of comments: 2 April 2010 Reviewer: Max Greene The E &SC plan for Fulfillment Farm Wetland Restoration submitted 8 March 2010 has received Engineering review. The plan cannot be approved as submitted. The plan proposes "Fill in the Flood Plain" and will require a "Special Use Permit ". Please contact the County's Chief of Zoning (Mr. Ron Higgins, Ext. 3225) for information on "Special Use Permits ". httD:// www.albemarle.ore /uDload/imaL,es /forms center /departments /countv attornev /forms /A lbemarle County Code Ch18 Zoning30 OverlU Districts.pdf Once a Special Use Permit has been obtained for the property the following items will be adequately addressed on the E &SC plan prior to resubmit. 1. Basin will be designed per VESCH Std. & Spec. 3.14. 2. Show the location of the borrow area for the berm construction. 3. Show the location of the "Construction Entrance" VESCH 3.02. 4. Show the location of the haul road. If the road does not exist then "Construction Road Stabilization" VESCH 3.03 may be required. 5. Show 100 year flood plain and County Stream Buffer Limits. http://gisweb. albemarle. org/RestoreMap. ashx ?state= 654591658248 Due to the extent of comment and conditions, additional comments will be forthcoming. Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email mgreene@albemarle.org to schedule an appointment. File: E1 esc MRG Fulfillment Farm.doc