HomeMy WebLinkAboutWPO201000015 Review Comments Erosion Control Plan 2010-04-28ALg�,��
1'IRGINZ�
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: WPO- 2010 - 00015, Route 250 East Sidewalk Improvements
Plan preparer: Frank Pohl (frank.pohl @timmons.com)
Owner or rep.: Hurt Investment Company Inc.
Date received: 4 March 2010
Date of Comment: 28 April 2010
Engineer: John P. Diez — Engineering Technician
The Erosion and Sediment Control Plan for the Route 250 East Sidewalk Improvements, received on 4
March 2010 has been reviewed. The plan cannot be approved as submitted and will require the following
corrections before approval can be granted:
A. Erosion and Sediment Control Comments
1. Construction entrances must be installed by all construction layout areas.
2. Please provide a construction entrance detail.
3. Please provide dust control (DC).
4. Please specify what the "construction laydown area" is. If it is a stockpile location, please label it
as such.
5. Please show and label Phase #1 and #2 on the plans.
\\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000015 - Route 250 East Sidewalk Improvements\El_esc_JPD_10 -00015 -
Rounte 250 East Sidewalk Improvements. doc