Project: Runway 3 Temporary Offset Localizer WP0201000010
Plan preparer: Delta Airport Consultants, Inc. [fax (804) 275 -8371]
Owner or rep.: Charlottesville - Albemarle Airport Authority [fax (434) 974 -7476]
Plan received date: 8 March 2010
Date of comments: 15 March 2010
Reviewer: Max Greene
The Water Protection plan for Runway 3 Temporary Offset Localizer submitted 8 March 2010
has received Engineering review. The plan can be approved as submitted.
Please submit at least 2 additional copies of the plan for approval and distribution during the pre -
construction meeting to be held in this office.
The WPO Bond amount is $27,900.00 and will be posted prior to issuance of the Grading permit.
The forms and instructions to post the Water Protection Ordinance Bond can be found on the
Community Development Department Web site on www.albemarle.org. You may contact Ana
Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further
information on bonding procedures.
Once the WPO bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
File: E2_esc,swm_MRG_Runway 3 Temporary Offset Localizer.docx
� OF AL
,. vIRGI1`IZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, Room 227
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832 Fax (434) 972 -4126
Project: Runway 3 Temporary Offset Localizer WP0201000010
Plan preparer: Delta Airport Consultants, Inc. [fax (804) 275 -8371]
Owner or rep.: Charlottesville - Albemarle Airport Authority [fax (434) 974 -7476]
Plan received date: 16 February 2010
Date of comments: 19 February 2010
Reviewer: Max Greene
The Water Protection plans for Runway 3 Temporary Offset Localizer submitted 16 February
2010 has received Engineering review. The plan can be approved after the following items have
been adequately addressed:
1. Stormwater Management and Mitigation Plan (WP0201000010)
a. This portion of the Airport is included in previous Stormwater Protection plans
and does not require additional SWM at this time.
2. Erosion Control Plan (WP0201000010)
a. Plan appears to show a diversion but is not labeled. Please label all proposed
E &SC measures.
b. Diversions on or across slopes 4:1 and greater need to show grading contour lines
to prove constructability.
c. Please add a label to the "Grading Layout" sheet to signify this is also the Erosion
and Sediment Control plan sheet.
d. Vicinity Map is supposed to be 1" =2000' by County Code.
Once these comments have been addressed, please submit 2 copies of the revised plans,
calculations, and narratives to Current Development Engineering.
Bond amounts will be determined at time of approval
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these
review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email
mgreene @albemarle.org to schedule an appointment.
File: E1_esc,swm_MRG_Runway 3 Temporary Offset Localizer.doc