Loading...
HomeMy WebLinkAboutWPO200900028 Review Comments Bond Estimate 2010-03-10BOND ESTIMATE - EROSION CONTROL PROJECT NAME: NORTHFORK REGIONAL PUMP STATION PROJECT NUMBER: WPO200900028 DATE OF ESTIMATE: 03/05/09 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 3.23 $1,500.00 $4,845.00 SILT FENCE LF 1808 $5.00 $9,040.00 TREE PROTECTION LF 2179 $5.00 $10,895.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 397 $3.00 $1,191.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0 $1,000.00 $0.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 2 $500.00 $1,000.00 INLET PROTECTION EA 1 $200.00 $200.00 OUTLET PROTECTION EA 0 $200.00 $0.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 1 $5,000.00 $5,000.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 34171.00 PROJECT MANAGEMENT LS 15% 5125.65 TOTAL 39296.65 PROJECT ADMINISTRATION 10% 3929.665 BOND AMOUNT REQUIRED 43300.00 Spreadsheet last revised: 12-5-09