WPO200900063 Review Comments Bond Estimate 2010-04-12
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Lone Oak Stream Mitigation PROJECT NUMBER: WPO200900063 DATE OF ESTIMATE: 04/12/10 ESTIMATE BY: MRG BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 60.5 1500 90750 SILT FENCE LF 10880 5 54400 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 Utility Stream Crossing EA 12 500 6000 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 36 30 1080 PAVED CONSTRUCTION ENTRANCE EA 3 2000 6000 subtotal 158230.00 project management 23734.50 subtotal 181964.50 CONTINGENCY LS 10% 18196.45 TOTAL 200160.95 BOND AMOUNT REQUIRED 200200.00