Loading...
HomeMy WebLinkAboutWPO201000024 Review Comments Stormwater Management Plan 2010-05-13OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Tabor Presbyterian Church Addition - Final [SDP201000030 & WP0201000024] Plan preparer: Eugene Ryang [eryang @ waterstreetstudio.net] Owner /Applicant: Tabor Presbyterian Church Plan received date: 23 April 2010 Date of comments: 13 May 2010 Reviewer: John P. Diez — Engineering Technician A. Final Site Plan 1. Please provide professional seal, signed and dated. [18- 32.6.1] 2. Please provide date for the topographic information. All topography should be at least visually field verified by the designer within the last year. [18- 32.6.6] 3. Proposed sloped steeper than 3:! must have low maintenance (not grass) ground cover specified on the plan. 4. All entrances must have VDOT designations (PE -1. CG -9a, etc.) 5. Please provide an entrance profile. Entrances must need exceed 4% grade for a distance of 40' from the intersected street, measured anywhere in the entrance. [18- 4.12.17] 6. Please provide unobstructed sight distance lines at entrances, less than 10' x Speed Limit of intersected streets, measured from a point 10' off the edge of pavement of the intersected streets. 7. VDOT approval must be obtained for any plans affecting public right -of -way. 8. Please label the biofilter on the plans. 9. It appears that the existing rock wall is interfering with the proposed culvert. Is the rock wall being demolished? Additional comments may be forthcoming once more information of received. 10. Temporary grading and construction easements will be necessary from TMP 56A2 -1 -15. 11. The drainage on Tabor Street must match with the Downtown Crozet Streetscape Project. Please revise. 12. Please specify if services will be done in the existing structure during construction. If so, additional comments may be forthcoming. B. Stormwater Management Plan 1. This site is located within the watershed of the County maintained Lickinghole Creek SWM facility. Per Board policy, all development within this watershed must pay a pro -rata fee in exchange for the water quality treatment provided by the facility. This development is not required to provide SWM quality onsite and County Engineering will not be reviewing this WPO application for water quality. The pro -rata fee will be computed at the time of plan approval. 2. Please be consistent with the C- values for gravel. Please use .70 as your C- value. 3. This property is located within a new potential SWM district. Over the next several months, the county will be shaping the parameters of this new district. If the SWM plan for this development is not approved prior to the Board Action, the property may be subject to its governing requirements. A possible outcome could be the collecting of a fee in exchange for providing detention Albemarle County Community Development Engineering Review Comments Page 2 of 2 requirements for development within the watershed. Until the scope of this facility /district is more refined, I recommend continuing with the current on -site detention design. C. Erosion and Sediment Control Plan 4. Please provide limits of clearing and grading encompassing all disturbances, entrances, staging and parking areas, areas where sediment laden runoff will cross, or any construction related activities. This must match any landscape and conservation plans if necessary. 5. Please provide dust control (DC). 6. Please provide temporary seeding (TS) and permanent seeding (PS). 7. Please provide a stockpile location. 8. Please provide outlet protection (OP) for culvert #2. 9. Permanent seeding must be placed immediately after grading the ditch on the east side of the site. 10. The silt fence on the proposed gravel travelway must be moved towards the west so the travelway can be built. 11. Please provide a diversion dike between the sediment trap and the east side of the new gravel entrance. 12. The wet storage length in the "wet storage optimization" must match the length at "Final Basin Design Information" as well as on the plans. \\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP201000030 Tabor Presbyterian Church Add. - Fina l \CDE1_fsp _ esc _ swm_JPD_Tabor Presbyterian Church Addition.doc