Loading...
HomeMy WebLinkAboutSDP201000038 Review Comments Final Site Plan and Comps. 2010-06-18OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Date of comments: Reviewer: A. Final Site Plan Comfort Suites Inn - Final [SDP201000038 & WP0201000025] M.M. Mills [mmills @ rkk.com] HTC Hotel LLC 4 June 2010 21 June 2010 John P. Diez — Engineering Technician 1. Proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plans. 2. Sidewalk abutting parking must be 6' wide (exclusive of curb), or bumper blocks are provided. Please refer to the Design Standards Manual. 3. Direction of flow change (or deflection angle) in each area is 90 degrees or greater (flow should not have a reverse direction). 4. Labels on all drainage structures on the plans must match with the drainage profiles. 5. Please provide concrete strength for concrete detail. 6. Please provide dumpster pad detail. Detail or specification to be a minimum 4" stone base and 6" concrete of 3000 psi at 28 days, or stronger, reinforced with a minimum grid of wire reinforcing or #4 bars at 12" on center. 7. Please provide end sections (ES -1) to the outfalls of pipes 20A and 30A. \\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP201000038 Comfort Suites Inn \CDEl_fsp_JPD_Comfort Suite Inn.doc