Loading...
HomeMy WebLinkAboutSDP201000039 Review Comments Preliminary Site Plan 2010-05-25vIRG1N� County of Albemarle Department of Community Development Memorandum To: Megan Yaniglos, Senior Planner From: John P. Diez, Engineering Review Division: Current Development Date: May 25, 2010 Subject: SDP201000039 Holiday Inn Express - Preliminary Site Plan The preliminary site plan for Holiday Inn Express, submitted on May 4, 2010, has been reviewed. Current Development Engineering has the following comments: Preliminary Site Plan Comments 1. It is difficult to read the direction of flow for the proposed pipes. Please revise. 2. Please provide a Simple Method Spreadsheet calculating the required removal rate of the proposed site. Please refer to the previously approved plans, WPO200600075 & WPO200700078. The biofilter proposed on the previous WPO applications has a 50% removal rate. If the post - development removal rate exceeds the 50 %, additional water quality may be required on site. Final Site Plan Comments (For information purposes only) 1. VDOT approval must be obtained prior to final site plan approval. \\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP201000039 Holiday Inn Express \CDEl _ psp_JPD_10 -00039 Holiday Inn Express.doc