HomeMy WebLinkAboutSDP201000039 Review Comments Preliminary Site Plan 2010-05-25vIRG1N�
County of Albemarle
Department of Community Development
Memorandum
To: Megan Yaniglos, Senior Planner
From: John P. Diez, Engineering Review
Division: Current Development
Date: May 25, 2010
Subject: SDP201000039 Holiday Inn Express - Preliminary Site Plan
The preliminary site plan for Holiday Inn Express, submitted on May 4, 2010, has been reviewed. Current
Development Engineering has the following comments:
Preliminary Site Plan Comments
1. It is difficult to read the direction of flow for the proposed pipes. Please revise.
2. Please provide a Simple Method Spreadsheet calculating the required removal rate of the proposed
site. Please refer to the previously approved plans, WPO200600075 & WPO200700078. The
biofilter proposed on the previous WPO applications has a 50% removal rate. If the post -
development removal rate exceeds the 50 %, additional water quality may be required on site.
Final Site Plan Comments (For information purposes only)
1. VDOT approval must be obtained prior to final site plan approval.
\\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP201000039 Holiday Inn Express \CDEl _ psp_JPD_10 -00039 Holiday Inn
Express.doc