Loading...
HomeMy WebLinkAboutSP201000009 Review Comments Special Use Permit 2010-06-04�� OF ALg� County of Albemarle Department of Community Development Memorandum To: Rebecca Ragsdale From: Bill Fritz Division: Zoning and Current Development Date: 6/4/10 Subject: SP 2010 -9 and ZMA 2010 -3 Morey Creek Professional Center I have reviewed the submitted information and offer the following comments. 1. Typically strutted parking requires numerous waivers from the design requirements of section 4.12. The most common waivers are for slope of travel ways, slope of parking spaces and sight distance. 2. With the information submitted I am not able to determine if the design requirements of section 32.7.2a are being met. This section requires that the structure be designed so that headlights and light fixtures will not routinely shine outside of the structure. Also, this section establishes standards for mechanical equipment and air handlers. Please insure that the applicant is aware of these requirements. If waivers are to be sought I recommend they be processed with the special use permit. 3. By separate email I will forward to you the standard report format for the evaluation of the critical slopes waiver. I am happy to discuss this waiver with you at any time. 4. This proposal requires off -site easements. I question of those properties should be part of the rezoning application as the application plan contemplates activity on this property. At a minimum it should be verified that the necessary easements can be obtained.