Loading...
HomeMy WebLinkAboutWPO201000011 Review Comments Bond Estimate 2010-05-12BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Treesdale PROJECT NUMBER: WPO- 2010 -00011 DATE OF ESTIMATE: 05/12/10 ESTIMATE BY: PBC BASED ON: Drawing signed 4 -7 -2010 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 18.35 1500 27525 SILT FENCE LF 3710 5 18550 TREE PROTECTION FENCE LF 6450 3 19350 SAFETY FENCE LF 1280 3 3840 DIVERSION DIKE LF 2590 3 7770 TEMPORARY SLOPE DRAIN LF 300 20 6000 SEDIMENT TRAP 1 ACRES 0.07 1000 70 SEDIMENT BASIN 1 ACRES 4.11 1000 4110 COMBINED SEDIMENT BASIN ACRES 13.59 1000 13590 SEDIMENT TRAP 1 (southern) ACRES 0.67 1000 670 SEDIMENT TRAP 2 ACRES 0.05 1000 50 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 68 200 13600 OUTLET PROTECTION EA 7 200 1400 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 90 55 4950 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal 125475.00 project management 18821.25 subtotal 144296.25 CONTINGENCY LS 10% 14429.63 TOTAL 158725.88 BOND AMOUNT REQUIRED 158800.00