Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000011 Review Comments Bond Estimate 2010-05-12 (3)
PROJECT NAME: Treesdale FILE #: WPO- 2010 -00011 DATE APPROVED: 30- Apr -10 Item Unit Amount Unit Cost Subtotal dam const.on site material cubic yard 500 $4.00 $2,000.00 dam const.off site material cubic yard 0 $15.00 $0.00 Shrubs seedlings 5 gallon container 68 $25.00 $1,700 trees & shrubs ball/burlap planted 16 $100.00 $1,600 wetland plants planted 585 $2.00 $1,170 EC -1 outlet protection each 3 $200.00 $600 class 1 rip -rap square yard 65 $55.00 $3,575 class 2 rip -rap square yard 0 $110.00 $0 48" concrete riser structure each 1 $1,000.00 $1,000 EC -2 EC -3 ditch stabilization linear foot 0.00 $10.00 $0 maintenance road linear foot 1380.00 $8.00 $11,040 Concrete pipe linear foot 50.00 $25.00 $1,250 EC -3, EC -2 matting square yard 0.00 $10.00 $0 concrete anti vortex each 1.00 $1,500.00 $1,500.00 Paved weir each 1.00 $1,000.00 $1,000.00 subtotal $26,435 project management 3,965 subtotal $30,400 10% Contingency $3,040 TOTAL $33,440 ROUNDED TOTAL $33,500 min total after reduction 7 $6,700