Loading...
HomeMy WebLinkAboutWPO201000010 Bond Estimates Bond Estimate 2010-05-21BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Fontaine Dam Repair W PO201000021 05/21/10 MRG Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1 1500 1500 SILT FENCE LF 0 5 0 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP Cu.Yd. 267 55 14685 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 18185.00 project management 2727.75 subtotal 20912.75 CONTINGENCY LS 10% 2091.28 TOTAL 23004.03 BOND AMOUNT REQUIRED 23100.00 last revised:12 -5 -01 BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Runway 3 Temporary Offset Localizer PROJECT NUMBER: WP0201000010 DATE OF ESTIMATE: 02/17/10 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 3 1500 4500 SILT FENCE LF 750 5 3750 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 450 3 1350 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0.64 1000 640 SEDIMENT TRAP 2 ACRES 0.98 1000 980 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 2 200 400 OUTLET PROTECTION EA 4 200 800 EC -2 & 3 DITCH PROTECTION LF 720 10 7200 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 14 30 420 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 22040.00 project management 3306.00 subtotal 25346.00 CONTINGENCY LS 10% 2534.60 TOTAL 27880.60 BOND AMOUNT REQUIRED 27900.00