Loading...
HomeMy WebLinkAboutWPO201000006 Review Comments No Submittal Type Selected 2010-05-20Max Greene From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Thursday, May 20, 2010 1:33 PM To: Amy Pflaum Cc: Max Greene Subject: WPO- 2010 -00006 Force Main and Gravity Sewer Project Amy, I have reviewed the above project and all VDOT comments have been adequately addressed. A Land Use Permit will need to be acquired prior to any construction within the Route 29 Right of Way. The permit will require a Maintenance of Traffic Plan in accordance with The Virginia Work Area Protection Manual and those details can be worked out during the permitting process. Thanks Joel Joel DeNunzio, P.E. Staff Engineer 434 - 293 -0011 Ext. 120 ioel . den unzioCcbvdot.vir4inia.00v