Loading...
HomeMy WebLinkAboutWPO201000031 Review Comments Bond Estimate 2010-06-08BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Free Bridge Office PROJECT NUMBER: WPO201000025 DATE OF ESTIMATE: 06/08/10 ESTIMATE BY: JPD BASED ON: $1,710.00 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.14 $1,500.00 $1,710.00 SILT FENCE LF 323 $5.00 $1,615.00 TREE PROTECTION LF 0 $5.00 $0.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 70 $3.00 $210.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0 $1,000.00 $0.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 0 $500.00 $0.00 INLET PROTECTION EA 7 $200.00 $1,400.00 OUTLET PROTECTION EA 0 $200.00 $0.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 6935.00 PROJECT MANAGEMENT LS 15% 1040.25 TOTAL 7975.25 PROJECT ADMINISTRATION 10% 797.525 BOND AMOUNT REQUIRED il 8800.00 readsheet last revised:3 -10 -10