Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900066 Review Comments Bond Estimate 2010-06-09
BOND ESTIMATE - EROSION CONTROL PROJECT NAME: CAMELOT PUMP STATION PROJECT NUMBER: WPO200900066 DATE OF ESTIMATE: 06/09/10 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.75 $1,500.00 $4,125.00 SILT FENCE LF 1159 $5.00 $5,795.00 TREE PROTECTION LF 1118 $5.00 $5,590.00 SAFETY FENCE LF 99 $3.00 $297.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 140 $3.00 $420.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 0 $1,000.00 $0.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 1 $200.00 $200.00 OUTLET PROTECTION EA 1 $200.00 $200.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 27 $30.00 $810.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 2 $2,000.00 $4,000.00 SUBTOTAL 21937.00 PROJECT MANAGEMENT LS 15% 3290.55 TOTAL 25227.55 PROJECT ADMINISTRATION 10% 2522.755 BOND AMOUNT REQUIRED jj 27800.00 readsheet last revised:3 -10 -10