Project: Avinity
Plan preparer: SCOTT COLLINS, PE [fax (434) 293 -37191
Owner or rep.: AVON PROPERTIES LLC. [fax Unknown]
Plan received date: 8 June 2004
Date of comments: 24 June 2004
Reviewer: Max Greene
The early grading plan for Avinity submitted 8 June 2010 has received Engineering review. The
proposed grading appears to be in accord with the preliminary site plan. The following
comments will be adequately addressed prior to final approval of the early grading and water
protection plan:
1. The phase 1 grading plan appears too broad in scope to provide adequate initial
protection. Please show the (SB) dam construction and excavation area without the extra
fill material that reduces the size of the basin for the first stage of protection. This will
allow the inspector earlier approval of the initial phase.
2. The emergency spillway channel does not appear to be in accord with Std. & Spec. 3.14
for the following reasons:
a. Constructed over fill material.
b. Located in areas of sharp turns or bends in flow path.
c. Principal spillway may be semi - permanent (installed and maintained past the
useful life of 18 months) and needs to carry full 25 year storm event.
3. Basin outlet appears to empty into adjacent yard's swale at a 90% angle. Please submit
an MS -19 detailed study for the outfall from the stormwater structure.
4. Proposed parking and staging area will require Std. & Spec. 3.03 (Construction Road
Stabilization) shown on the plan sheet and added to narrative.
5. Basin note on plan "larger freeboard has been provided" does not appear correct. Plan
appears to show minimum required freeboard in both the plan view and design.
6. Future removal of sediment basin and site grading for last building could be difficult with
the current proposed location of riser and outfall pipe. This office recommends utilizing
one of the proposed final outfall locations for the early grading plan to help facilitate the
construction of the final construction phase.
The E &SC portion of the Water Protection Bond will be determined when the ES &C plan is
ready for approval. Due to the current extent of requested changes to the E &SC plan sheet and
narrative, additional comments and/or conditions may be forthcoming.
Engineering Review Comments
Page 2 of 2
Once these comments have been addressed, please submit 2 copies (add 1 more copy if VDOT
needs to review, and 1 more if mass - grading that Planning needs to review) of the revised plans,
calculations, and narratives to Current Development Engineering.
Current Development Engineering is available from 2:30 -4 PM on Thursdays to discuss these
review comments. Please contact Max Greene at 434 - 296 -5832 ext. 3283 or email
mgreene @albemarle.org to schedule an appointment.
File: E1—Early Grading E &SC_MRG_Avinity.doc