Loading...
HomeMy WebLinkAboutSUB201000064 Review Comments Final Plat 2010-06-18Development Name Old Trail Village Block 3, Phase B SUB200900161, SDP200900093 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Mornington Lane (alley) 10 +00 to 12 +35 Road Length 235.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 8.0 in d 235.0 ft L 20.0 ft W 116.0 cy $43.09 $5,000.80 2 blotted or prime &double seal 0.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 0.0 in d 235.0 ft L 20.0 ft W 0.0 tons $88.20 $0.00 4 asphalt surface 2.0 in d 235.0 ft L 20.0 ft W 43.9 tons $98.28 $4,311.22 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 0.0 ft $16.59 $0.00 8 sidewalk, asphalt 0.0 in d 235.0 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 0.0 ft $13.99 $0.00 sidewalk, concrete 8' width (along Old Trail Drive) 0.0 $25.00 $0.00 10 ramp CG -12 0 $378.00 $0.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 1 $59.22 $59.22 13 guardrail (or rebuild wall in right -of -way) 2 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 1 $1,638.00 $1,638.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES -1,2 $250 0 EC -1 $200 95.0 ft $27.72 $2,633.40 17 pipe, rcp (54 to 72 ") 54.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $189.00 $0.00 18 pipe, pvc (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES -1,2 $250 1 EC -1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC -2,3 1750 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 235.0 ft L 30.0 ft W 0.0 acre $12,600.00 $0.00 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 0.0 cy $3.78 $0.00 24 CBR tests (1 every 0.1 mi. per road) 235.0 ft L 0.47 inc of 500' 0 $189.00 $0.00 25 as -built drawings (1 k +price per 0.1 mi.) 235.0 ft 0.0445 mi. 0 $1,260.00 $0.00 26 survey and layout (price per 0.1 mi.) 235.0 ft L 0.0445 mi. 0 $630.00 $0.00 27 mobilization 0 $630.00 $0.00 28 VDOT surety (per 1/10 lane- mile)* 0.0 ft L 0 1/10 mi. 0 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)* 0.0 ft L 0 1/10 mi. $500 +$125 *1/10 centerline mill $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane 1 0.0 ft L 0 1/10 mi. $500 +$250 *1/10 centerline mils $250.00 $0.00 cost sum $13,720.64 project management 15% $2,056.10 subtotal $15,778.73 contigency 10% $1,577.87 Total 1 $17,400 6/18/2010