HomeMy WebLinkAboutSDP201000037 Review Comments Minor Amendment 2010-06-16vIRGIN� County of Albemarle Department of Community Development Memorandum To: Scott Collins, Collins Engineering From: Elizabeth Marotta- Senior Planner Division: Zoning & Current Development Date: May June 16, 2010 Subject: SDP 2010 -037 Woodlands Minor Site Plan Amendment to Sherwood Rec The Planner for the Zoning & Current Development Division of the Albemarle County Department Community Development will recommend approval of the plan referred to above when the following items have been satisfactorily addressed. (The following comments are those that have been identified at this time. Additional comments or conditions may be added or eliminated based on further review.) 1. Identify owner of the subject property (in addition to developer info). The owner of record appears to be Sherwood Manor Homeowners Association, not the Dovetail Companies. 2. I do not believe Joseph Johnson is the correct contact at the Dovetail Companies. Please provide the correct information. 3. Cover sheet identifies TMP76P -1 -1 as the subject property, yet the plan indicates TMP76P -2 -2 might also be affected. Please provide property lines on the plans and if necessary, revise subject parcel information on Sheet 1. 4. Provide zoning for TMP76P -1 -1 under reference with DB 541 -501. UPDATE: a. R -15 was not added to the cover sheet, and that is the zoning for the Woodlands property that is being disturbed and subject to this amendment. For all of the properties being disturbed, be specific (on the cover sheet) what zoning districts apply. b. Parcel identification on Sheet 2 is not consistent for each parcel. Each notation should include the TMP, owner, zoning, use, and instrument reference. 5. Please clarify how "total acreage" of 0.83 was calculated (from Sheet 1, General Notes). UPDATE: Please break down the total disturbance that will occur on each parcel. 6. Evidence of (amended) agreement to temporary construction easement is required prior to plan approval. 7. Show limits of "reforestation area" so the intent of the note on Sheet 6 requiring replanting cannot be misinterpreted or disputed. UPDATE: Once stormwater issues are resolved, resubmit plans for further review. As these limits may change, I cannot determine if as proposed, it is approvable. 8. It appears tress will be disturbed/removed in order to construct the retaining wall. Please revise E &S plan accordingly. UPDATE: Response noted, however, once stormwater issues are resolved, resubmit plans for further review. As limits of clearing/ E &S may change, I cannot determine if as proposed, it is approvable. 9. As drawn, tree protection fencing is shown going thru trees; please revise to located tree protection fencing to as close to the dripline as possible. UPDATE: Response noted, however, once stormwater issues are resolved, resubmit plans for further review. As limits of clearing/ E &S may change, I cannot determine if as proposed, it is approvable. 10. Please provide a sheet with a revised planting plan and conservation checklist, and note on that sheet that the landscape plan revisions shown are intended to amend SDP2007 -51, LOR #1, as approved 3/23/10. UPDATE: Response noted, however, once stormwater issues are resolved, resubmit plans for further review. As proposed landscaping may change, I cannot determine if as proposed, it is approvable. 11. Engineering approval is required. Please contact Elizabeth Marotta at the Department of Community Development 296 -5832 ext. 3432 for further information. 2