HomeMy WebLinkAboutSDP201000022 Review Comments Preliminary Site Plan 2010-06-15 (3)Elizabeth Marotta
From: Amy Pflaum
Sent: Tuesday, June 15, 2010 11:19 AM
To: Elizabeth Marotta
Subject: RE: hollymeade prelim
Engineering approval to include:
❑ The plan must meet all engineering requirements of the Water Protection, Subdivision, and Zoning Ordinances in
addition to all engineering standards detailed in the County's Design Manual.
❑ A Traffic Impact Analysis (per VDOT Chapter 527) must be prepared and submitted with the plan.
❑ Tree Preservation areas should be staked in the field and protected with measures described in the VESCH.
County staff should field verify protected areas prior to the issuance of a grading permit.
Please contact Current Development Engineering at 296 -5832 if you have questions or require additional information.
From: Elizabeth Marotta
Sent: Tuesday, June 15, 2010 10:29 AM
To: Amy Pflaum
Subject: hollymeade prelim
Amy,
I put hollymeade prelim in your chair. It should be the copy that gets stamped approved.
Please let me know if /when you are able to approve the plan and if you have any conditions you would like me to add to
the approval letter.
I have the approval letter drafted and once I hear from you (and revise it per your comments) it will be good to go!
Thank you,
Elizabeth M. Marotta
Senior Planner
County of Albemarle Community Development Department
401 McIntire Road
Charlottesville, VA 22902
(434) 296 -5832 Ext. 3432