Loading...
HomeMy WebLinkAboutSDP201000046 Review Comments Major Amendment, Final Site Plan 2010-07-01� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Kingdom Hall of the Jehovah's Witness [SDP201000046, WP0201000034] Plan preparer: William Moore [wmoore @balzer.cc] Owner or rep.: East Congregation of Jehovah's Witnesses; Morgan Davis ETAL TRS Plan received date: 15 June 2010 Date of comments: 1 July 2010 Reviewer: John P. Diez — Current Development - Engineering Technician A. Final site plan (SDP201000046) 1. Please provide the application number of the previously approved site plan that this plan is amending. 2. All proposed slopes steeper than 3:1 must have low maintenance (not grass) ground cover specified on the plan. 3. All entrances must have VDOT designations (PE -1, CG -9a, etc.) 4. VDOT approval must be obtained for any plan affecting right -of -way. 5. Please clarify arrow stripping in the parking area. B. Stormwater Management Plan (WP0201000034). 6. Please provide a completed copy of the standard stormwater maintenance agreement and fee for recordation for any stormwater management facilities. 7. Please label STR #3 and #4 on the profile. 8. Please replace the sidewalk turn-down with a CG -2 and shift 6" out to allow the minimum 5' width of sidewalk. 9. Please show all utility crossings on the profiles. 10. Minimum pipe sizes into and out of the facility must be 15" diameter for maintenance. 11. It appears that the some of the runoff in post - development is now flowing to a SWM facility. The run -off from DA #2 must be captured for stormwater management treatment. 12. With the added impervious from DA #2, please revise the size for the biofilter. If the facility is to treat 50% removal rate, then the first 0.5" of runoff is to be treated. Please size the biofilter using the 2.5% of the total impervious area. In addition: - Please provide 2.5' of sand/soil media. - The floor of the biofilter must be flat (0% slope) - Please provide 1' — 1.5' of stone drain in geotech fabric under media, with 6" perforated pipe to daylight. - Please provide 1' ponding depth. Please refer to the SWMH Section 3.11A and 5 -6.1 and the Design Standards Manual for specs. and details. Engineering Review Comments Page 2 of 2 C. Erosion Control Plan (WPO201000034) 13. Please provide a stockpile location. 14. Please provide a staging and parking area. 15. Please show on the detail or plan that the wet storage side slope is 1:1 or flatter. 16. Please extend the diversion dike towards the northeast side of the proposed building. 17. Please provide a construction entrance prior to #6 of the construction sequence. Protection must be provided for all stages of construction. Once these comments have been addressed, please submit two (2) copies of the revised plans, calculations, and narratives to Current Development Engineering. Current Development Engineering is available from 2:30pm — 4:00pm on Thursdays to discuss these review comments. Please contact Amy Pflaum at 434 - 296 -5832 or apflaum @albemarle.org to schedule an appointment. If you have any questions, you can reach me, John Diez, at (434) 296 -5832 ext. 3025, or my email: jdiez@albemarle.org. \\ Cob- dts01 \cityviewlnk\Docs \2010 \SDP \SDP201000046 Kingdom Hall- Major \CDE1- fsp,esc,swm_JPD_ Kingdom Hall.doc