Project:
WPO- 2010 - 00019, Meriiields Driveway
Plan preparer:
Roxanne S. Brouse (rsb @rielyandassociates.com)
Owner or rep.:
Woddriff Jaffray P or Merrill Saunton W.
Date received:
12 March 2010
Rev. 1:
20 May 2010
Rev. 2:
28 June 2010
Date of Comment:
14 April 2010
Rev. 1:
15 June 2010
Rev. 2:
28 June 2010
Engineer:
John P. Diez — Engineering Technician
The Erosion and Sediment Control Plan for Merifields Driveway, received on 28 June 2010 has been
reviewed. The plan cannot be approved as submitted and will require the following corrections before
approval can be granted:
A. Erosion and Sediment Control Comments
Limits of disturbance do not match between sheets EC -1 through EC -3. Please revise.
(Rev. I) Comment has been addressed.
2. Limits of disturbance must be shown on sheet GS -1.
(Rev. I) Comment has been addressed.
3. Label all existing and proposed streets.
(Rev. I) Comment has been addressed.
4. Please provide Temporary Seeding (TS) and Permanent Seeding (PS).
(Rev. I) Comment has been addressed.
5. Please provide Dust Control (DC).
(Rev. I) Comment has been addressed.
6. Sediment Basin #1 must show proposed grading and contours must be labeled. The basin must
also be included in the limits of disturbance.
(Rev. I) Comment has been addressed.
7. Labeling of Sediment Traps must be consistent.
(Rev. I) Comment has been addressed.
8. Please clarify as to where Phase #1 and #2 begin and finish.
(Rev. I) Comment has been addressed.
9. The construction entrance can be moved up to the area where construction begins.
(Rev. l) Comment has been addressed.
10. Proposed contours do not tie in to existing contours in some parts of the proposed driveway.
(Rev. I) Comment has been addressed.
It. Any proposed grading and /or construction disturbing critical slopes require a critical slopes waiver
to be submitted.
(Rev. 1) Comment has been addressed. However, please add a note on the plans stating that
"no existing critical slopes will be impacted during this project ".
(Rev. 2)Comment has been addressed.
12. Pipe locations on the plans do not match with the profile. Please revise
(Rev. 1) Comment has not been addressed. Please see pipes #3 and #7.
(Rev. 2)Comment has been addressed.
13. Grading on any part of the driveway must not exceed 16 %.
(Rev. 1)Per our previous engineering meeting, comment has been addressed.
14. Please provide stationing and a profile of the driveway up to the house.
(Rev. ])Per our previous engineering meeting, please disregard comment.
15. Elevations on the EC sheets do not match with the elevations on the CALC sheet. Please revise.
(Rev. 2)Comment has been addressed.
16. It seems that the stone weir elevations for Sediment Trap #4 are incorrect. Please revise.
(Rev. 2)Comment has been addressed. However, Sediment Trap #3 has the same elevation for
both "bottom of stone weir" and "bottom trap elevation '. Please revise.
(Rev. 2)Comment has been addressed.
17. Sediment Traps #5 and #6 have embankments that exceed the 5' maximum. Please refer to the
VESCH, Spec. 3.13 for proper embankment heights.
(Rev. 2)Comment has been addressed.
The Erosion & Sediment Control Plan (WP0201000019) submitted 23 June 2010 have received
Engineering Review and meet Albemarle County minimum checklist items for approval. Please
submit 4 paper copies of the Plan to Current Development Engineering.
The E &SC bond amount is $123,700. The forms and instructions to post the Water Protection
Ordinance Bond can be found on the Community Development Department Web site on
www.albemarle.oriz.
Once the E &SC bond has been posted, you may contact the Department of Community
Development to arrange a pre - construction meeting with a County Erosion & Sediment Control
Inspector. Should the County Inspector find the limits of disturbance increased or the need for
additional control measures required to protect the site, additional fees will be required.
\\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000019 - Merifields Driveway\E3_esc_JPD_10 -00019 - Merifields
Driveway.doc