Loading...
HomeMy WebLinkAboutSDP201800061 Correspondence Minor Amendment 2018-11-12 t q.. Dewberry Engineers Inc. 804.290.7957 Dewberry. 4805 Lake Brook Drive, Suite 200 804.290.7928 fax Glen Allen,VA 23060 www.dewberry.com November 12,2018 County of Albemarle,Department of Community Development Attn:Andy Reitelbach, Senior Planner 401 McIntire Road Charlottesville,VA 22902-4596 RE: ACSA Admin&Ops Center—Minor Amendment 1st Re-submission • Project File Number: SDP201800061 Dear Mr.Andy Reitelbach, On behalf of the Albemarle County Service Authority,Dewberry Engineers Inc. is pleased to submit for your review and approval the final plans for the ACSA Operations Center Expansion Parking Lot Expansion revised per three(3) sets of county comments. Eight(8) copies of the Final Design(100%) plans signed November 12,2018 are being submitted for your review.Below are the comments along with responses(shown in bold)that were received from your review dated September 17,2018. 1. [General Comment]Revise the title of this plan to indicate that it is a Minor Amendment, and include the former site plan application numbers, SDP19930001 and SDP201500013,that are being amended. Response; Title has been revised as requested. Former application numbers have been provided on the cover page beneath the title. 2. [General Comment]As this is a minor amendment,provide a list of all proposed changes on the cover sheet. Response: A list of proposed changes has been added to the cover sheet below the sheet index. 3. [General Comment] On page 0.3,there is a note regarding the proposed stairway to look at separate plans. There are no other plans within this application that pertain to the stairway. It appears that this stairway may have been approved as a Letter of Revision (LOR)in May 2018. If this is the case,please indicate the application number and approval date for this LOR in the note on the stairway. Response: A letter of revision(LOR#1)was approved on May 31,2018 for revisions to SDP2015-13. 4. [32.5.2(a)] In the zoning note,include that this property is located within the Entrance Corridor and Steep Slopes—managed overlay districts. • Response: Overlay District information added on cover sheet. Page 1 of 3 Mr.Reitelbach ACSA Operations Center Expansion Parking Lot Expansion SDP201800061 1s1 Submission Comment Responses 5. [32.5.2(b)]Include on the cover sheet the acreage of the subject parcel. Response: Acreage has been included on cover sheet. 6. [32.5.2(a) and 4.20(a)] Please include the setbacks in the data table on the cover sheet. In the HC Zoning District,the minimum front setback is 10' from the right-of-way. The minimum side and rear setbacks should state,"Primary structures shall be constructed and separated in accordance with the current edition of the Building Code." Response: Setback information has been added to the cover sheet. 7. [32.7.3 and 4.12] On Sheet CO.3,please also include in the parking summary the number of spaces that is required for this use. Response: Number of required parking spaces has been added to the parking summary on sheet CO.3. 8. [32.5.2(i)]Label the access road to this site,indicate if it is public or private,and provide its right-of-way and pavement widths. Response: Access road(People P1)has been labeled as requested. Spotnap Rd adjacent to building has also been labeled. 9. [32.7.9]The plant schedule on sheet L1.1 states that there are three(3) QP, Quercus phellos,trees proposed for the landscaping. However,on the plan on sheet L1.0,only two (2)QP trees are shown. Please add an additional QP to the plan to match what is shown in the plant schedule. Response: A QP tree has been added to the plan on sheet L1.0. 10. [4.17] In the Electrical Plan on E1.0,there appears to be a tree in the proposed drive aisle of the new parking area. Please remove this tree. Response: Tree has been removed from plan. 11. [4.17] On sheet C3.0,the light poles proposed to be removed in the demolition plan on C2.0 are still shown in their current locations. Please remove these existing poles from the layout plan on sheet 3.0 since they are proposed to be relocated. Response: Light poles have been removed from sheet C3.0. 12. [4.17] Please clarify the light fixture type proposed for this project,as shown on sheet E1.1. The graphic describes the light fixture type as Cl and C3. However,the lighting fixture schedule only has information on"Type A". It also does not appear to indicate whether this proposed lighting is a full cut-off fixture or not,as is required. Response: Sheet E1.0 identifies two new type"A"light fixtures.The lighting fixture schedule on sheet E1.1 specifies a type"A"light fixture.This is the only new light fixture type included in the project.Title of detail 1/E1.1 include fixture types"Cl"and"C3". The detail title will be revised to reference the Type"A"fixture.This fixture meets the requirements of full cut-off.See attached for manufacturer photometric report. Dewberry® Page 2 of 3 Mr Reitelbach ACSA Operations Center Expansion Parking Lot Expansion SDP201800061 15t Submission Comment Responses This letter is provided as part of the resubmittal process and addresses all of the comments above. If you have any questions or require clarification please let us know. Sincerely, 4 aw.L... Kevin Pennock • Dewberry. Page 3 of 3 10/11/2018 For use with Series E Edge,Edge High Output,228,304 an... OUTDOOR PHOTOMETRIC REPORT +S, , rar t CATALOG:FOR USE WITH SERIES E EDGE,EDGE HIGH OUTPUT,228,304 AN... "`� S ti MANUFACTURER: CREE INC. TEST#: 12484-G No TEST LAB: CREE INC.-DURHAM TECHNOLOGY CENTER CATALOG: FOR USE WITH SERIES E EDGE,EDGE HIGH OUTPUT,228,304 AND LEDWAY PhOp-O LUMINAIRES. A+,+aitatlte DESCRIPTION: EDITED FROM 60 LED TYPE IV MEDIUM OPTICS 700MA 4000K LEDWAY STREETLIGHTS LAMP: SIXTY WHITE LIGHT EMITTING DIODES(LEDS)VERTICAL BASE-UP POSITION LAMP OUTPUT: 1 LAMP,RATED LUMENS/LAMP: 11036 INPUT WATTAGE: 132.5 LUMINOUS OPENING:POINT MAX CD: 6,706.5 AT HORIZONTAL:45°,VERTICAL:60° CUTOFF CLASS: FULL CUTOFF ROADWAY CLASS: SHORT,TYPE III EFFICIENCY: 100% Polar Candela Distribution Isofootcandle Plot 6,809, 1(°,170° 1600 150° 140°- 5 4 3 2_ 1. 0,,,_ .1 .-.. 2 •__3 4 5,667i r 130° t , i ._ 4,533:- . . . .. • :120° i t , 3,400,--- - 3 , 2,267 1100 , 1,133 -. t' 100° 2 , 1,133` ,80° 0 j ,, 2,267- - • , 1 1 : , 3,4001 • I ,60° 4,533' 2 • 5,667' S0° 3 6,8001 VA:0° 10° 20° 30° 40° ■ -lax Cd:45°H 4 ■ -0°H • ■ -90°H 5 ■20 fc 0 1 fc ■10fc ■0.5fc ■5fc Il•0.1 fc ■50%Max Cd Distance in units of mount height(20ft) --- Max Cd VISUAL PHOTOMETRIC TOOL 1.2.46 COPYRIGHT 2018,ACUITY BRANDS LIGHTING. THIS PHOTOMETRIC REPORT HAS BEEN GENERATED USING METHODS RECOMMENDED BY THE IESNA.CALCULATIONS ARE BASED ON PHOTOMETRIC DATA PROVIDED BY THE MANUFACTURER,AND THE ACCURACY OF THIS PHOTOMETRIC REPORT IS DEPENDENT ON THE ACCURACY OF THE DATA PROVIDED.END-USER ENVIRONMENT AND APPLICATION(INCLUDING,BUT NOT LIMITED TO,VOLTAGE VARIATION AND DIRT ACCUMULATION)CAN CAUSE ACTUAL PHOTOMETRIC PERFORMANCE TO DIFFER FROM THE PERFORMANCE CALCULATED USING THE DATA PROVIDED BY THE MANUFACTURER.THIS REPORT IS PROVIDED WITHOUT WARRANTY AS TO ACCURACY, COMPLETENESS,RELIABILITY OR OTHERWISE.IN NO EVENT WILL ACUITY BRANDS LIGHTING BE RESPONSIBLE FOR ANY LOSS RESULTING FROM ANY USE OF THIS REPORT. 12484-G VISUAL PHOTOMETRIC TOOL PAGE 1 OF 4 http://www.visual-3d.com/tools/photometricViewer/default.aspx?sessionid=723996 1/4 '10/11/2018 For use with Series E Edge,Edge High Output,228,304 an... OUTDOOR PHOTOMETRIC REPORT iv� r-J s CATALOG:FOR USE WITH SERIES E EDGE,EDGE HIGH OUTPUT,228,304 AN... {� ZONAL LUMEN SUMMARY LUMENS PER ZONE ZONE LUMENS°/o_LAMP %LUM_INAIRE ZONE LUMENS %TOTAL ZONE LUMENS%TOTAL 0-30 1,095.8 9.9% 9.9% 0-10 85.0 0.8_% 90 0.0 0% -100 00 0-40 2,319.2 21% 21% 10-20 315.3 2.9% 100-110 0.000 0% 0-60 7,420.1 67.2% 67.2% 20-30 695.5 6.3% 110-120 0.000 0% ' 60-90 3,618.0 32.8% 32.8% 30-40 1,223.4 11.1% 120-130 0.000 0% 70-100 1,062.3 9.6% 9.6% 40-50 1,949.9 17.7% 130-140 0.000 0% 90-120 0.000 0% 0% 50-60 3,151.1 28.5% 140-150 0.000 0% 0-90 11,038.2 100% 100% 60-70 2,555.7 23.2% 150-160 0.000 0% 90-180 0.000 0% 0% 70-80 960.8 8.7% 160-170 0.000 0% 0-180 11,038.2 100% 100% 80-90 101.5 0.9% 170-180 0.000 0% ROADWAY SUMMARY LCS TABLE CUTOFF CLASSIFICATION: FULL CUTOFF BUG RATING B2 U- O-G2 DISTRIBUTION: TYPE III,SHORT FORWARD LIGHT LUMEN_ _S LUMENS% MAX CD,90 DEG VERT: 0.000 LOW(0-30): 586.7 5.3% MAX CD,80 TO<90 DEG: 1,019.4 MEDIUM(30-60): 3,885.7 35.2% LUMENS %LAMP HIGH(60-80): 2,650.6 24% DOWNWARD STREET SIDE: 7,218.6 65.4% VERY HIGH(80-90): 95.6 0.9% DOWNWARD HOUSE SIDE: 3,818.5 34.6% BACK LIGHT DOWNWARD TOTAL:11,037.1 100% LOW(0 30): 508.5 4.6% UPWARD STREET SIDE: 0.000 0% MEDIUM(30-60): 2,438.1 22.1% UPWARD HOUSE SIDE: 0.000 0% HIGH(60 80): 866.3 7.8% UPWARD TOTAL: 0.000 0% VERY HIGH(80-90): 5.5 0% UPLIGHT TOTAL LUMENS: 11,0-37.1 100% LOW(90-100): 0.000 0% HIGH(100-180): 0.000 0°/_0 TRAPPED LIGHT: 0.000 0% L{ 12484-G VISUAL PHOTOMETRIC TOOL PAGE 2 OF 4 http://www.visual-3d.com/tools/photometricViewer/default.aspx?sessionid=723996 2/4 • 10/11/2018 For use with Series E Edge,Edge High Output,228,304 an... ' OUTDOOR PHOTOMETRIC REPORT CATALOG:FOR USE WITH SERIES E EDGE,EDGE HIGH OUTPUT,228,304 AN... Acuity rands. LCS Graph ---05..9/9 4.-- ,. UH 100-180° 0 Im ,,, - ,....„,....426%,-.I- , ____ ,„,.,- ,-.- / / - „ . -. / / ..----- . \ \ i / / -, \ t ,/ /.., . / \ \ \ 7 1.,..-9%,, ‘. , , , \ UL 90-100° i /i __ . ,,, . A UL 90-100° 0 Im /-------1--..._ 1' // \ '\ 1--- i 0 Im 0% I —1--------_/ ,,..------ '096 I I NH 80-90° ,.,-;" .... . FVH 80-90° 5.5 Im 1 —A--------s..--,' 1. '~-,, i -- J 95.6 Im 0% \ --- . - N,s, ' ` , '',.... „' . f -—_----, 0.9% ‘ % • ,„ '^-,,,.. /I / BH 60-80° \ „,,' \... •,• :de oe 1 . FH 60-80° 866.3 Im \ ,' ' , -'- _ __ _,..-- . ,, 2650.6 Im 73% 'Ci\ 24% . ' BM 30-60° s,. , FM 30-60° 2438.11m </ 3885.7 Im 22.1% '.. ,'.,, 35.2% Back Light BL 0- oo 30° —'-' -- - 586FL 0- 0° Forward Light 508.5 Im .7 3 Im 4.6% 5.3% Scale=Max LCS% 0 Trapped Light:Olm,0% • • ,.l'i 12484-G 6,,U VISUAL PHOTOMETRIC TOOL PAGE 3 OF 4 http://www.visual-3d.com/tools/photometricViewer/defaultaspx?sessionid=723996 3/4 t0/11/2018 For use with Series E Edge,Edge High Output,228,304 an... OUTDOOR PHOTOMETRICUSE WITH REPORT CI�F ura f S' CATALOG:FOR USE WITH SERIES E EDGE,EDGE HIGH OUTPUT,228,304 AN... 1�[1t E�U CAN DE_LA TABLE-TYPE C 0 15 t 25 _35 45 55 65 75 85 90 1.05 1.15 • 125 1.35 145 155 165 ` 175 180 0 830 830 830 830 830 830 830 830 830 830 830 830 830 830 830 830 830 830 830 5 865 868 868 868 866 863 862 860 858 854 853 847 846 845 844 845 844 846 847 10 956 971 981 982, 972 959 952 946 944 937 932 927 929 935 940 951 957 963 967 15 1081 1109 1132 1150 1133 1116 1105 1090 1072 1055 1026,1013'1020 1051 1086 1118 1140 1156 1162 20 1239 1291 1325 1353 1353 1377 1354 1293 1228 1183 1090 1077 1113 1168 1219'1266 1309 1336 1343 25 1560 1587 1615 1632 1733 1839 1709 1559.1422 1341 1221 1190 1202 1264 1357 1437 1508 1550 1561 30 1882 1918 1960 2002 2304 2310 1987 1749 1554 1462 1340 1326 1361 1427 1540 1642 1729 1763 1774 35 2• 092 2129 2197 2313 2750 2665 2217 1884 1638 1579 1543 1552 1574_1602 1682 1806 1907 1939 1946 35 40 2224 2251 2345 2577 3133 30 2434 2006 1828 1799 1779 1792 1766 1716 1740 1842 1955 2033 2• 052 45 2• 495 2447 2656 3173 3740 3442 2667 2401 2329 2291 2094 1954 1842 1723 1745 1893 2083 2218 2• 243 • 50 3051 2946 3332 4538 5035 4564 4108 4135 4097 3974 3357 2773 2178 1849 1858 1948 2031 2093 2097 55 3670 3383 3642 5378 6108 6034 5205 4815 4376 4175 3699 3457 3020 2167 1795 1712 1752 1810 1828 _60 3969 3785 3898 5829 6706 5377.4297 3766 3320 3150 2962 2968 2654 1950 15401398,1427 1474 1482 65 4065 4131 4• 296 6339 6100 4025 2850 2314'1948 1828.1604.1518 1467 1257 1099 981 960 1004 1014 70 3085 3066 3• 082 4489 4317 2239 1508 1123 907 855 833 773 631 583 609 640 656 706 716 75 1987 1718 1568 2483 2448 1007 589 340 232 233 348 366 357 423 458' 459 494 513 520 80 777 664 602 945' 1019 350 139 56 37 34 69 82 63 54 53 41 33 40 40 85 249 225 192 237 2.21 37 9 5 3 2 7 9 4 1 0 0 0 0 0 90 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 95 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 100 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 105 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 110 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 115 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 120 0 0 0 0 0 0 0 _0 0 0 0 0 0 0 0 0 0 0 0 125 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 130 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 135 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 140 0 0 0 0 0 0 _ 0 0 0 0 0 0 0 0 0 0 0 0 0 145 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 0 150 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 o 0 0 155_ 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0. 0 0 160 0 0 0 0 66 0 0 0 0 0 0 0 0 0 0 0 0 0 165 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 170 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 175 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 180 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 t 12484-G 6. VISUAL PHOTOMETRIC TOOL PAGE 4 OF 4 http://www.visual-3d.com/tools/photometricViewer/default.aspx?sessionid=723996 4/4 Dewberry Engineers Inc. 804.290.7957 101 Dewberry 4805 Lake Brook Drive,Suite 200 804.290.7928 fax Glen Allen,VA 23060 www.dewberry.com November 12, 2018 • County of Albemarle,Department of Community Development Attn: John Anderson, Site Plan Reviewer 401 McIntire Road,Room 227 Charlottesville,VA 22902-4596 RE: ACSA Admin&Ops Center—Minor Amendment 1st Re-submission Project File Number: SDP201800061 Dear Mr.John Anderson, On behalf of the Albemarle County Service Authority,Dewberry Engineers Inc. is pleased to submit for your review and approval the final plans for the ACSA Operations Center Expansion Parking Lot Expansion revised per three(3)sets of county comments. Eight(8)copies of the Final Design(100%) plans signed November 12,2018 are being submitted for your review.Below are the comments along with responses(shown in bold)that were received from your review dated September 13,,2018. 1. A separate standalone VSMP permit is required. Please remove the following from the Minor Site Plan Amendment: CO.2;portion of C2.0 related to ESC; C5.0, C5.1; C6.2; C6.3. Response: All of the above have been removed from Minor Site Plan Amendment. These sheets are now included in the separate stand-alone VSMP plan set. 2. Recommend revise title of Minor Site Plan Amendment to include SDP 102800061', Minor Site Plan Amendment' and to delete '100%submission'. (Engineering recommendation only.) Response: Title has been revised per comment. 3. Title VSMP Plan: `Albemarle County Service Authority Operation Center Expansion Parking Lot Expansion,VSMP/WPO2018-00068'. Response: Title of VSMP plan revised per comment. 4. Ref.Albemarle County Code, Chapter 17, Sec. 17-401 thru 17-405 for VSMP Application form and content requirements (incl. SWPPP,PPP,ESC/SWM plans+ Application/fee requirements). Response: Form and content requirements will be reviewed and used. 5. C3.1 —Label ditch and ditchline slope on upslope side of retaining wall. Response: Ditch and slope have been labeled. Page 1 of 5 Mr Anderson ACSA Operations Center Expansion Parking Lot Expansion SDP201800061 1st Submission Comment Responses 6. C3.1 —Recommend revise description of Str.20(in data arranged as table)to include 48"diameter. Response: Description.has been revised. 7. (Rev. 13-Sep)After further consideration of 18-30.7.5 design standards,plan review, and discussion,a combination of grade at base of wall not to exceed 2:1 and wall height not to exceed 6' is permissible;however,revised design must eliminate angle at top of 2:1 fill slope. Option recommendation: provide min. 1' wide bench, 1-2% slope away from base of wall. ACSA to coordinate slope-grade design revision with Dewberry. Further, Dewberry is encouraged to consider stabilization matting for existing drainage way at base of wall/base of 2:1 slope that will likely be'in proposed fill section and susceptible to erosion. Response: A 1'wide bench,sloping away from the wall at 2%,tying into existing grade at 2:1 has been provided at base of wall. Blanket matting has been specified for all slopes 3:1 and greater. a. Proposed design must meet each applicable standard listed at 18-30.7.5.a.1-3, b.1-4;please call if any questions. Response: These standards are satisfied. RE: 18-30.7.5(b)(3)(iii)—an easement agreement will be obtained with the abutting parcel owner. b. (Rev. 13-Sep) Comment withdrawn. c. Comment withdrawn. d. Consider constructability/possible need for off-site temporary construction easement. Response: A temporary construction,and permanent maintenance easement has been added to sheet C3.1. e. Proposed design(w/2:1 slope at toe,to be eliminated)required 6' horizontal space;4.5' is available between face of wall and property line. Response: An easement agreement will be obtained with the abutting parcel owner. f. Show property line(accurate scale)in profile view. Response: The property line has been shown on the profiles on sheet C3.2. g. Comment withdrawn. 8. C4.0—Revise STM 24 MH-1 label(typo)—diameter should read 60". Response: Label has been corrected. 9. C4.0—Provide note that steps are required for MH depth>4.0'. Response: Note has been added. 10. C4.0—Compare inside crown of pipe elevation, 375.75 (INV IN, STM 20),with 10-yr even elevation,376.52. Detention pipe must be sized to contain a 10-yr event without exceeding interior elevation(of top of pipe,at lowest point). Avoid pressurized system. Recommend examine next larger pipe diameter. Dewberry. Page 2 of 5 Mr.Anderson ACSA Operations Center Expansion Parking Lot Expansion . SDP201800061 1st Submission Comment Responses Response: The last two sections of detention pipes have been upsized to 42".With this change,the 10 year WSE in the pipes is 375.95'which is below the lowest elevation of the crown of the pipe,376.25'. 11. C4.0—STM 20,provide ref.to weir plate detail, sheet C5.3. Response: Reference has been provided. 12. C4.1 —Conduit flex table slope and length values for node#25,30 do not match profile labels, C4.0, C4.1. Review/revise for consistency. Response: The conduit flex table has been updated to reflect the correct lengths. 13. C5.2—Recommend detail for handrail post, since detail provided assumes handrail set in retaining wall. Proposed handrail is not on wall,but behind wall,in fill section. Also note: handrail design must prevent easy access to top of wall. If rail slopes down with grade behind wall, ensure design provides suitable deterrent to trespass/prevents access to top of wall. Response: Detail for handrail post has been added. A note has been added to C3.0 to maintain 42"between top of wall and top of railing. 14. C5.3—Show MH steps schematically in top view of weir plate MH detail,to limit conflict and guide installation during construction. Response: MH step location has been shown in requested detail. 15. C5.3—Provide VDOT ST-1 (MH step)detail. Response: Detail has been provided on sheet C5.2. 16. C5.3—Provide trash rack,4"orifice. Response: A trash rack has been provided and called out on the weir wall detail. VSMP(preview comments); additional comments likely,once VSMP Application submitted: 17. CO.2,ESC Maintenance/Note 2: Revise to specify paved construction entrance.Provide paved CE detail. Ref.ACDSM/p. 8. Response: ACDSM paved construction entrance has been specified on this page and updated in plan view on sheet C2.1. Detail has been provided on sheet C5.0. 18. C0.2, ESC Sequence item 4 must come prior to item 3;install silt fence prior to clearing/grubbing. Response: Sequence has been updated. 19. C2.0—Revise CE label to read PCE(Incl.PCE in ESC legend). Response: ESC has been removed from sheet C2.0(Demolition Plan) and moved to C2.1 (Phase 1 ESC Plan)and C2.2 (Phase 2 ESC Plan). PCE is located on C2.1 t•iDewberry® • Page 3 of 5 Mr Anderson ACSA Operations Center Expansion Parking Lot Expansion SDP201800061 1st Submission Comment Responses 20. Provide schematic depicting Phase 2, once retaining wall constructed and STM25 installed. See ESC Sequence note 6(storm structure#25). Provide phased ESC schematic. Response: ESC has been phased into Phase 1 and Phase 2,sheets C2.1 and C2.2 respectively. 21. In Phase 2 schematic,specify V'ESCH blanket stabilization for ditch behind(upslope side of)retaining wall to limit proximate effect on adjacent property, should erosion develop in this area. Response: Blanket matting has been specified for this area on sheet C2.2. Detail provided on sheet C5.1. 22. C5.0—Provide paved construction entrance detail—ref.p. 8,ACDSM;also, comment 17, above. Response: ACDSM paved construction entrance detail provided. 23. (Rev. 13-Sep)ACSA has purchased credits;will work with Albemarle to address any outstanding nutrient credit purchase document(VSMP)needs or requirements. Response: N/A 24. C6.2—Provide stormwater quality/quantity narrative to outline and demonstrate compliance. Response: A stormwater quality/quantity narrative has been added to sheet C6.2. 25. C6.3—Energy balance is incomplete and confusing. Provide RV(i yr,pre-/post development). Response: Energy balance spreadsheet has been cleaned up to show the RV for both pre and post conditions. Since there is offsite area flowing into the detention pipes(the existing parking lot) and this area is being detained,the maximum allowable discharge was calculated as follows: -The site area was analyzed using the energy balance equation("Allowable Site Area Peak Discharge") -The discharge was calculated from the offsite area("Offsite Area Peak Discharge") -These discharges were added together to get the"Maximum Allowable Peak Discharge." The calculated 1 year allowable discharge is 0.77 cfs and the 1 year flow at the outfall is 0.77 cfs. 26. C6.3—Provide routing for 1-year event,pre-development;provide model input/hydrograph. Response: All routings for the 1 year, 10 year,and 100 year storms have been included on sheet C6.3-C6.4. 27. Use county SWPPP template. Response: The county SWPPP template will be used. ti Dewberry. Page 4 of 5 • Mr.Anderson ACSA Operations Center Expansion Parking Lot Expansion- SDP201800061 1"Submission Comment Responses This letter is provided as part of the resubmittal process and addresses all of the comments above.If you have any questions or require clarification please let us know. Sincerely, tr,;;L)4 114,40/_, Kevin Pennock • b Y 6t�dUIV(i�lt6�;) P7i1r`Pr 10 Dewberry® Page 6 of 5 Andy Reitelbach From: Andy Reitelbach Sent: _ Thursday, November 7, 2019 5:39 PM To: Alex Morrison Cc: John Anderson Subject: SDP2018-00061 ACSA HQ Parking Lot Expansion -Approval Good afternoon Alex, The signed, approved copies of the site plan minor amendment for SDP2018-00061,ACSA operations center parking lot expansion,are now available at the front desk of CDD for you to pick up at your convenience. Please let me know if you have any questions. Best regards, Andy A vldre w RetiteU>a ch' Senior Planner Albemarle County Community Development Department 401 McIntire Road Charlottesville,VA 22902 areitelbach@albemarle.org 434.296.5832 x3261 1