Loading...
HomeMy WebLinkAboutWPO201000014 Review Comments Bond Estimate 2010-06-29BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Fulfillment Farm PROJECT NUMBER: WPO201000014 DATE OF ESTIMATE: 06/29/10 ESTIMATE BY: MRG BASED ON: Approved plan WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 14 1500 21000 SILT FENCE LF 1300 5 6500 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 1 200 200 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 29700.00 project management 4455.00 subtotal 34155.00 CONTINGENCY LS 10% 3415.50 TOTAL 37570.50 BOND AMOUNT REQUIRED 37600.00 last revised:12 -5 -01