Loading...
HomeMy WebLinkAboutWPO200900010 Review Comments Bond Estimate 2010-06-30BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Meadowcreek Interceptor Upgrade- Contract A and B PROJECT NUMBER: WPO- 2009 -00010 DATE OF ESTIMATE: 06/30/10 ESTIMATE BY: PBC BASED ON: Plan received on December 4th, 2009 Contract A WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.83 1500 4245 SILT FENCE LF 2920 5 14600 TURBIDITY CURTAIN LF 40 50 2000 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 MELBOURNE ACCESS ROAD LF 800 8 6400 STREAM BANK RESTORATION EA 1 5000 5000 Contract B WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.86 1500 1290 SILT FENCE LF 800 5 4000 TREE PROTECTION FENCE LF 280 3 840 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 STREAM BANK RESTORATION EA 1 1000 1000 subtotal 43375.00 project management 6506.25 subtotal 49881.25 CONTINGENCY LS 10% 4988.13 TOTAL 54869.38 BOND AMOUNT REQUIRED 54900.00