Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900065 Review Comments Bond Estimate 2010-07-07
PROJECT NAME: The Reserve at Belvedere FILE #: WPO- 2009 -00065 DATE APPROVED: 7- Jul -10 Item Unit Amount Unit Cost Subtotal dam const.on site material cubic yard 3000 $4.00 $12,000.00 Wetland Plantings planted 1623 $4.00 $6,492 class 1 rip -rap square yard 69 $55.00 $3,795 48" concrete riser structure each 1 $1,000.00 $1,000 maintenance road linear foot 860.00 $8.00 $6,880 Concrete pipe linear foot 100.00 $25.00 $2,500 Concrete spillway each 1.00 $1,000.00 $1,000.00 concrete anti vortex each 1.00 $1,500.00 $1,500.00 subtotal $35,167 project management $5,275 subtotal $40,442 10% Contingency $4,044 TOTAL $44,486 ROUNDED TOTAL $44,500 min total after reduction $8,900