Loading...
HomeMy WebLinkAboutWPO200900065 Review Comments Bond Estimate 2010-07-07 (3)BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: The Reserve at Belvedere W PO- 2009 -00065 07/07/10 PBC Plan submitted 6/24 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 17.32 1500 25980 SILT FENCE LF 2680 5 13400 TREE PROTECTION FENCE LF 2000 3 6000 DIVERSION DIKE LF 1760 3 5280 SEDIMENT TRAP 2 ACRES 0.81 1000 810 SEDIMENT BASIN 1 ACRES 23.25 1000 23250 INLET PROTECTION EA 46 200 9200 RIP -RAP LF 35 55 1925 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal project management subtotal CONTINGENCY TOTAL BOND AMOUNT REQUIRED 89845.00 13476.75 103321.75 LS 10% 10332.18 113653.93 113700.00 last revised:12 -5 -01