Loading...
HomeMy WebLinkAboutWPO200800069 Review Comments Bond Estimate 2010-07-19BOND ESTIMATE - EROSION CONTROL PROJECT NAME: Moores Creek PROJECT NUMBER: DATE OF ESTIMATE: ESTIMATE BY: ADS BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 5 1500 7500 SILT FENCE LF 2600 5 13000 SAFETY FENCE LF 5 3 15 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 150 3 450 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 VEHICULAR STREAM CROSSING EA 1 2000 2000 UTILITY STREAM CROSSING EA 2 1000 2000 CULVERT INLET PROTECTION EA 0 500 0 INLET PROTECTION EA 0 200 0 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP STREAMBANK STABILIZATIi LF 250 150 37500 CHECK DAMS SQ.YD. 10 30 300 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal 66765.00 project management 10014.75 subtotal 76779.75 CONTINGENCY LS 10% 7677.98 TOTAL 84457.73 BOND AMOUNT REQUIRED 84500.00 last revised:12 -5 -01