HomeMy WebLinkAboutWPO201000046 Review Comments Stormwater Management Plan 2010-09-01OF AL O ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner /Applicant: Plan received date: Date of comments: Reviewer: Town & Country Shopping Center — WP0201000046 William Moore, PE [wmoore @balzer.cc] Tap Investments, LLC 26 July 2010 1 September 2010 John P. Diez — Engineering Technician A. Stormwater Management Plan 1. Please provide a Letter of Intent from the owner of the pond allowing the use of the stormwater management facility for water quality and quantity. 2. Please provide acreage and hydrologic coefficient for the drainage areas of the proposed site. 3. Please provide construction easements from all adjacent owners that are affected by construction (TMP 78 -11 and TMP -9B). A. Erosion and Sediment Control Plan 4. Please provide a Letter of Intent from the owner of the pond allowing the use of the facility as an erosion and sediment control perimeter control facility. This can be stated in the Letter of Intent for the SWM facility. 5. Engineering is a bit confused by the phasing of the E &S plan. On the Phase 1 line, silt fence appears to be installed that will not have water running into it in either phase. In phase 1, all water will be concentrated at the northern corner of the property, which will not be permitted. A diversion should be provided from the CIP to the entrance to TMP 78 -9B. In the corner of the site where fill is being added, please provide a fill diversion that is to direct water to the CIP. If a letter from the pond is received to allow use as a sediment basin, engineering review will allow this culvert to be protected by silt fence per 3.08 -1. If this agreement is not received, the CIP will need to be designed as a trap per Plate 3.08 -2. With regards to the phasing in the construction sequence, it appears that in order to establish the stone base for the building in Step D, significant grading operations will be required, which is referenced much later in Step G. Please simplify the plan by installing the CIP, diversion (fill diversions after grading begins), ROW diversion, and pipe 2 first. 6. Construction entrances are required to drain to a sediment trap or basin per VESCH. In the current proposed location of the construction entrance, runoff will be directed across an existing parking lot currently in use and into storm inlets that would require inlet protection. This is not an acceptable place for construction traffic to be releasing sediment from tires. The construction entrance must be moved to the western corner of the site where sediment can be diverted into the storm sewer and taken to the sediment basin more immediately. 7. Please include the proposed grading in your limits of disturbance. Albemarle County Community Development Engineering Review Comments Page 2 of 2 8. Please provide a safety fence around the site (or at least in front of the property and at the top of the retaining wall construction in the southern corner of the site) \\ Cob- dts01 \cityviewlnk\Docs \2010 \WPO \WPO201000046 Town & Country Shopping Center \CDE1_esc_swm_7PD_Town & Country Shopping Center.doc