HomeMy WebLinkAboutWPO201000043 Review Comments Bond Estimate 2010-07-30BOND ESTIMATE - EROSION CONTROL (AND SWM) Spreadsheet last revised:12 -5 -01
PROJECT NAME:
Saint Anne's Belfield Preschool Amendment
PROJECT NUMBER:
WPO- 2010 -00043
DATE OF ESTIMATE:
07/30/10
ESTIMATE BY:
PBC
BASED ON:
Plan submitted July 16th 2010
WATER ITEM DESCRIPTION
UNIT
QUANTITY
UNIT COST ITEM TOTAL
SEED, FERTILIZE, MULCH
ACRE
0.93
1500
1395
SILT FENCE
LF
260
5
1300
SAFETY FENCE
LF
3
0
TEMPORARY SLOPE DRAIN
LF
20
0
SEDIMENT TRAP 1
ACRES
1000
0
SEDIMENT BASIN 1
ACRES
1000
0
CULVERT INLET PROTECTION
EA
500
0
INLET PROTECTION
EA
8
200
1600
OUTLET PROTECTION
EA
0
200
0
PAVED DITCH
LF
60
20
1200
RIP -RAP
LF
0
55
0
CHECK DAMS
SQ.YD.
0
30
0
PAVED CONSTRUCTION ENTRANCE
EA
1
2000
2000
200 SF BIOFILTER (SWM)
EA
1
10000
10000 <_= SEE NOTE BELOW
subtotal 17495.00
project management 2624.25
subtotal 20119.25
CONTINGENCY LS 10% 2011.93
TOTAL 22131.18
BOND AMOUNT REQUIRED 22200.00
DO NOT RELEASE SWM BOND UNTIL THE BIOFILTER IS BUILT OR CD ENGINEERING APPROVALS NEW SWM CALCS (SEE