Loading...
HomeMy WebLinkAboutWPO201000043 Review Comments Bond Estimate 2010-07-30BOND ESTIMATE - EROSION CONTROL (AND SWM) Spreadsheet last revised:12 -5 -01 PROJECT NAME: Saint Anne's Belfield Preschool Amendment PROJECT NUMBER: WPO- 2010 -00043 DATE OF ESTIMATE: 07/30/10 ESTIMATE BY: PBC BASED ON: Plan submitted July 16th 2010 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.93 1500 1395 SILT FENCE LF 260 5 1300 SAFETY FENCE LF 3 0 TEMPORARY SLOPE DRAIN LF 20 0 SEDIMENT TRAP 1 ACRES 1000 0 SEDIMENT BASIN 1 ACRES 1000 0 CULVERT INLET PROTECTION EA 500 0 INLET PROTECTION EA 8 200 1600 OUTLET PROTECTION EA 0 200 0 PAVED DITCH LF 60 20 1200 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 200 SF BIOFILTER (SWM) EA 1 10000 10000 <_= SEE NOTE BELOW subtotal 17495.00 project management 2624.25 subtotal 20119.25 CONTINGENCY LS 10% 2011.93 TOTAL 22131.18 BOND AMOUNT REQUIRED 22200.00 DO NOT RELEASE SWM BOND UNTIL THE BIOFILTER IS BUILT OR CD ENGINEERING APPROVALS NEW SWM CALCS (SEE EMAIL DATED 7 -31 -2010 IN THE FILE)