HomeMy WebLinkAboutWPO201000006 Review Comments Erosion Control Plan 2010-08-12� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Plan preparer: Owner or rep.: Plan received date Date of comments: Reviewer: Force Main and Gravity Sewer Project Whitman, Requardt and Assoc., LLP University of Virginia Foundation 3 August 2010 12 August 2010 Max Greene WP0201000006 [fax (804) 272 -88971 [fax Unknown] The 100% complete E &SC plan for the Force Main and Gravity Sewer Project submitted 3 August 2010 has received Engineering review. The Water protection plan can be conditionally approved as follows: The following note will be added to the plan sheets: "Silt fence will be constructed across the Sanitary Sewer excavation area immediately upon backfilling. The measure will be of sufficient length to eliminate end flow, and the plan configuration will resemble an arc or horseshoe with the ends oriented upslope (see plate 3.05 -2, VESCH). " Please submit 4 or more copies of the WPO plan for approval and distribution during the pre - construction meeting. Due to proffer 4.3 for North Point PUD (AKA Towers Project) ZMA200000009, additional E &SC measures may be required to protect this site from the loss of sediment. The Water Protection Officer may add additional E &SC measures as required to adequately protect downstream properties. The WPO bond amount for this project is $131,300.00 and will be posted and approved prior to issuance of the Grading permit. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org . You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Once the E &SC bond and the SWM bond have been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. This WPO plan is valid for one year after the date of approval. [17- 204.6.G] Copies of temporary grading easements are required prior to entering each property included in this plan. Approval of this plan does not grant permission to trespass. File: E3_esc_MRG_Force Main and Gravity Sewer Project.doc