Loading...
HomeMy WebLinkAboutWPO201000034 Review Comments Bond Estimate 2010-08-04BOND ESTIMATE - EROSION CONTROL PROJECT NAME: KINGDOM HALL PROJECT NUMBER: WPO201000034 DATE OF ESTIMATE: 07/27/10 ESTIMATE BY: JPD BASED ON: WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 1.8 $1,500.00 $2,700.00 SILT FENCE LF 503 $5.00 $2,515.00 TREE PROTECTION LF 0 $5.00 $0.00 SAFETY FENCE LF 0 $3.00 $0.00 TEMPORARY FILL DIVERSION LF 0 $3.00 $0.00 DIVERSION DIKE LF 245 $3.00 $735.00 TEMPORARY SLOPE DRAIN LF 0 $20.00 $0.00 SEDIMENT TRAP 1 ACRES 1.48 $1,000.00 $1,480.00 SEDIMENT TRAP2 ACRES 0 $1,000.00 $0.00 CULVERT INLET PROTECTION EA 1 $500.00 $500.00 INLET PROTECTION EA 1 $200.00 $200.00 OUTLET PROTECTION EA 3 $200.00 $600.00 EC -2 & 3 DITCH PROTECTION LF 0 $10.00 $0.00 RIP -RAP LF 0 $55.00 $0.00 CHECK DAMS SQ.YD. 0 $30.00 $0.00 STREAM CROSSING TYPE I EA 0 $1,000.00 $0.00 STREAM CROSSING TYPE II EA 0 $3,000.00 $0.00 STREAM CROSSING TYPE III EA 0 $5,000.00 $0.00 PAVED CONSTRUCTION ENTRANCE EA 1 $2,000.00 $2,000.00 SUBTOTAL 10730.00 PROJECT MANAGEMENT LS 15% 1609.50 TOTAL 12339.50 PROJECT ADMINISTRATION 10% 1233.95 BOND AMOUNT REQUIRED jj 13600.00 readsheet last revised:3 -10 -10