Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000006 Review Comments Bond Estimate 2010-08-12
BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Force Main and Gravity Sewer Project PROJECT NUMBER: WPO201000006 DATE OF ESTIMATE: 08/12/10 ESTIMATE BY: MRG BASED ON: Conditional approval WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 17.2 1500 25800 SILT FENCE LF 7600 5 38000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 2720 3 8160 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 1.36 1000 1360 SEDIMENT TRAP 2 ACRES 2.18 1000 2180 SEDIMENT TRAP 3 ACRES 1.65 1000 1650 SEDIMENT TRAP 4 ACRES 1.31 1000 1310 SEDIMENT TRAP 5 ACRES 2.98 1000 2980 SEDIMENT TRAP 6 ACRES 0.63 1000 630 SEDIMENT TRAP 7 ACRES 0.6 1000 600 CULVERT INLET PROTECTION EA 9 500 4500 INLET PROTECTION EA 10 200 2000 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 CONSTRUCTION ENTRANCE EA 7 2000 14000 subtotal 103770.00 project management 15565.50 subtotal 119335.50 CONTINGENCY LS 10% 11933.55 TOTAL 131269.05 BOND AMOUNT REQUIRED 131300.00