Loading...
HomeMy WebLinkAboutSUB200600375 Review Comments Bond Estimate 2010-08-16Ashcroft West ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Summit Ridge Trail 10 +00 to 43 +49.4c Road Length 3350.0 ft Item Item Number Cost 1 aggregate base 8.0 in d 2 blotted or prime &double seal 3 asphalt base in d 4 asphalt surface 2.0 in d 11 street name sign 12 traffic control sign 13 guardrail (or rebuild wall in right -of -way) 19 pipe, cmp (15 to 48 ") 15.0 in d 20 pipe, cmp (54 to 72 ") 60.0 in d 21 rip -rap, placed 22 E &S fabric,EC -2,3 23 clear and grub (for wooded sites) 24 grading (per cy for cut or import only) 24 CBR tests (1 every 0.1 mi. per road) 25 as -built drawings (1 k + price per 0.1 mi.) 26 survey and layout (price per 0.1 mi.) 27 mobilization Road D 10 +00 to 14 +99.7( Road Length 500.0 ft Item No. Unit Unit Cost Cost 1 aggregate base (installed) blotted or prime &double seal 3350.0 ft L 20.0 ft W 1654.3 cy $43.09 $71,288.00 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 ft L 3.0 ft W 0.0 tons $88.20 $0.00 3350.0 ft L 20.0 ft W 625.3 tons $98.28 $61,457.76 24 1 $78.00 $78.00 25 3 $59.22 $177.66 2 ES @ $3700 150.0 ft $20.16 $3,024.00 2 ES -1,2 $250 1 EC -1 $200 60.0 ft $27.72 $1,663.20 0 ES -1,2 $250 0 EC -1 $200 0.0 ft $175.20 $0.00 0.0 ton $37.80 $0.00 3650 ft L 4 ft W 1622.2 sy $12.60 $20,440.00 3350.0 ft L 50.0 ft W 3.8 acre $12,600.00 $48,450.41 828.0 cy fill 9083.0 cy cut 9083.0 cy $3.78 $34,333.74 ` 3350.0 ft L 6.7 inc of 500' 8 $189.00 $1,455.30 3350.0 ft L 0.6345 mi. 7 $1,260.00 $8,820.00 3350.0 ft L 0.6345 mi. 7 $630.00 $4,410.00 $1,260.00 1 $630.00 $630.00 1 $630.00 Road Sum $256,228.07 10 +00 to 14 +99.7( Road Length 500.0 ft Item Item Number Unit Cost 1 aggregate base 2 blotted or prime &double seal 3 asphalt base 4 asphalt surface 1 1 street name sign 12 traffic control sign 13 guardrail (or rebuild wall in right -of -way 21 rip -rap, placed 22 E &S fabric,EC -2,3 23 clear and grub (for wooded sites) 24 grading (per cy for cut or import only) 24 CBR tests (1 every 0.1 mi. per road) 25 as -built drawings (1 k + price per 0.1 mi 26 survey and layout (price per 0.1 mi.) 27 mobilization Grading numbers from applicant and totaled to Summit Ridge Trail 8/16/2010 No. Unit Unit Cost Cost (installed) 6.0 in d 500.0 ft L 18.0 ft W 166.7 cy $43.09 $7,182.00 0.0 ft L 18.0 ft W 0.0 sy $7.56 $0.00 in d ft L 3.0 ft W 0.0 tons $88.20 $0.00 2.0 in d 500.0 ft L 18.0 ft W 84.0 tons $98.28 $8,255.52 1 $78.00 $78.00 2 $59.22 $118.44 2 ES @ $3700 300.0 ft $20.16 $6,048.00 0.0 ton $37.80 $0.00 600 ft L 4 ft W 266.7 sy $12.60 $3,360.00 500.0 ft L 50.0 ft W 0.6 acre $12,600.00 $7,231.40 cy fill cy cut 0.0 cy $3.78 $0.00 " 500.0 ft L 1 inc of 500' 2 $189.00 $378.00 .) 500.0 ft L 0.0947 mi. 1 $1,260.00 $1,260.00 500.0 ft L 0.0947 mi. 1 $630.00 $630.00 1 $630.00 $630.00 Road Sum $35,171.36 cost Sum $291,399.44 project management 15% $43,709.92 subtotal $335,109.35 contigency 10% $33,510.94 Total $366,700 Grading numbers from applicant and totaled to Summit Ridge Trail 8/16/2010