Loading...
HomeMy WebLinkAboutWPO201000054 Review Comments Erosion Control Plan 2010-08-20� DF ALg� �IRGINI� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, Room 227 Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Force Main and Gravity Sewer Project Addendum WP0201000006 Plan preparer: Townes Site Engineering - Brian Mitchell [fax (804) 748 -2590] Owner or rep.: CWH Properties Limited Partnership [fax Unknown] Plan received date: 13 August 2010 Date of comments: 20 August 2010 Reviewer: Max Greene E &SC plan for the Force Main and Gravity Sewer Project Addendum submitted 13 August 2010 has received Engineering review. Due to proffer 4.3 for North Point PUD (AKA Towers Project) ZMA200000009, additional E &SC measures may be required to protect this site from the loss of sediment. The Water Protection Officer may add additional E &SC measures as required to adequately protect downstream properties. The Total WPO bond amount for this project is now $146,500.00 and will be posted and approved prior to issuance of the Grading permit. The forms and instructions to post the Water Protection Ordinance Bond can be found on the Community Development Department Web site on www.albemarle.org. You may contact Ana Kilmer (Albemarle County Department of Community Development) at ext. 3246 for further information on bonding procedures and Maintenance Agreements. Once the E &SC bond has been posted, you may contact the Department of Community Development to arrange a pre - construction meeting with a County Erosion & Sediment Control Inspector. Should the County Inspector find the limits of disturbance increased or the need for additional control measures required to protect the site, additional fees will be required. This WPO plan is valid for one year after the date of approval. [17- 204.6.G] Copies of temporary grading easements are required prior to entering each property included in this plan. Approval of this plan does not grant permission to trespass. File: E3_esc_MRG_Force Main and Gravity Sewer Project.doc