Loading...
HomeMy WebLinkAboutSUB201000074 Review Comments Bond Estimate 2010-08-19Development Name Old Trail Block 13A - SUB201000074 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Upland Drive 14 +00 to 17 +00 Road Length 300.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 6.0 in d 300.0 ft L 20.0 ft W 111.1 cy $43.09 $4,788.00 2 blotted or prime &double seal 300.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 300.0 ft L 20.0 ft W 84.0 tons $88.20 $7,408.80 4 asphalt surface 2.0 in d 300.0 ft L 20.0 ft W 56.0 tons $98.28 $5,503.68 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 600.0 ft $16.59 $9,956.52 8 sidewalk, asphalt 0.0 in d 300.0 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 600.0 ft $13.99 $8,391.60 10 ramp CG -12 2 $378.00 $756.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 2 $59.22 $118.44 13 guardrail (or rebuild wall in right -of-way) 0 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 0 $1,638.00 $0.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $27.72 $0.00 17 pipe, rep (54 to 72 ") 54.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $189.00 $0.00 18 pipe, love (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC-2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 300.0 ft L 30.0 ft W 0.2 acre $12,600.00 $2,603.31 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $2,268.00 24 CBR tests (1 every 0.1 mi. per road) 300.0 ft L 0.6 inc of 500' 2 $189.00 $302.40 25 as -built drawings (1k+ price per 0.1 mi.) 300.0 ft 0.0568 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 300.0 ft L 0.0568 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)* 300.0 ft L 0.5682 1/10 mi. 2 Lanes $3,000.00 $3,409.09 29 VDOT inspection fee (per 1/10 mile)* 300.0 ft L 0.5682 1/10 mi. $500 +$125 *1/10 centerline mils $125.00 $571.02 30 VDOT admin. cost recovery fee(per center lane 1 300.0 ft L 0.0568 1/10 mi. $500 +$250 *1/10 centerline mill $250.00 $514.20 cost sum project management 15% subtotal 7$5656..74 contigency 10% Total 1 $62,300 8/19/2010 Development Name Old Trail Block 13A - SUB201000074 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Penny Well Lane 13 +00 to 16 +00 Road Length 300.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 6.0 in d 300.0 ft L 20.0 ft W 111.1 cy $43.09 $4,788.00 2 blotted or prime &double seal 300.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 3.0 in d 300.0 ft L 20.0 ft W 84.0 tons $88.20 $7,408.80 4 asphalt surface 2.0 in d 300.0 ft L 20.0 ft W 56.0 tons $98.28 $5,503.68 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 600.0 ft $16.59 $9,956.52 8 sidewalk, asphalt 0.0 in d 300.0 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 0.0 ft $13.99 $0.00 10 ramp CG -12 0 $378.00 $0.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 2 $59.22 $118.44 13 guardrail (or rebuild wall in right -of-way) 0 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 2 $1,638.00 $3,276.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES-1,2 $250 0 EC-1 $200 80.0 ft $27.72 $2,217.60 17 pipe, rep (54 to 72 ") 54.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $189.00 $0.00 18 pipe, love (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES-1,2 $250 1 EC-1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC-2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 300.0 ft L 30.0 ft W 0.2 acre $12,600.00 $2,603.31 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $2,268.00 24 CBR tests (1 every 0.1 mi. per road) 300.0 ft L 0.6 inc of 500' 2 $189.00 $302.40 25 as -built drawings (1k+ price per 0.1 mi.) 300.0 ft 0.0568 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 300.0 ft L 0.0568 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)* 0.0 ft L 0 1/10 mi. 2 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)* 0.0 ft L 0 1/10 mi. $500 +$125 *1/10 centerline mils $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane 1 0.0 ft L 0 1/10 mi. $500 +$250 *1/10 centerline mill $250.00 $0.00 cost sum $41,040.75 project management 15% $6,156.11 subtotal $47,196.66 contigency 10% $4,719.69 Total 1 $52,000 8/19/2010 Development Name Old Trail Block 13A - SUB201000074 ROAD Construction Bond Estimate (roads, site work, storm sewer) Updated 11120109 with changes to VDOT fees Road Name Penny Well Court 10 +00 to 12 +50 Road Length 250.0 ft Item Item No. Unit Unit Cost Cost Number installed 1 aggregate base 8.0 in d 250.0 ft L 20.0 ft W 123.5 cy $43.09 $5,320.00 2 blotted or prime &double seal 250.0 ft L 0.0 ft W 0.0 sy $7.56 $0.00 3 asphalt base 0.0 in d 250.0 ft L 20.0 ft W 0.0 tons $88.20 $0.00 4 asphalt surface 2.0 in d 250.0 ft L 20.0 ft W 46.7 tons $98.28 $4,586.40 6 curb CG -2 0.0 ft $10.08 $0.00 7 curb CG -6 0.0 ft $16.59 $0.00 8 sidewalk, asphalt 0.0 in d 250.0 ft L 4.0 ft W 0.0 tons $88.20 $0.00 9 sidewalk, concrete 4' width 0.0 ft $13.99 $0.00 10 ramp CG -12 0 $378.00 $0.00 11 street name sign 1 $78.00 $78.00 12 traffic control sign 2 $59.22 $118.44 13 guardrail (or rebuild wall in right -of-way) 0 ES @ $3700 0.0 ft $20.16 $0.00 14 manhole or drop inlet 4 $1,638.00 $6,552.00 16 pipe, rcp (15 to 48 ") 15.0 in d 0 ES-1,2 $250 0 EC-1 $200 300.0 ft $27.72 $8,316.00 17 pipe, rep (54 to 72 ") 54.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $189.00 $0.00 18 pipe, love (4 to 10 ") 8.0 in d 0.0 ft $7.56 $0.00 19 pipe, cmp (15 to 48 ") 15.0 in d 2 ES-1,2 $250 1 EC-1 $200 0.0 ft $27.72 $0.00 20 pipe, cmp (54 to 72 ") 60.0 in d 0 ES-1,2 $250 0 EC-1 $200 0.0 ft $175.20 $0.00 21 rip -rap, placed 0.0 ton $37.80 $0.00 22 E &S fabric, EC-2,3 0 ft L 4 ft W 0.0 sy $12.60 $0.00 23 clear and grub (for wooded sites) 250.0 ft L 30.0 ft W 0.2 acre $12,600.00 $2,169.42 24 grading (per cy for cut or import only) 600.0 cy fill 500.0 cy cut 600.0 cy $3.78 $2,268.00 24 CBR tests (1 every 0.1 mi. per road) 250.0 ft L 0.5 inc of 500' 2 $189.00 $283.50 25 as -built drawings (1k+ price per 0.1 mi.) 250.0 ft 0.0473 mi. 1 $1,260.00 $1,260.00 26 survey and layout (price per 0.1 mi.) 250.0 ft L 0.0473 mi. 1 $630.00 $630.00 27 mobilization 1 $630.00 $630.00 28 VDOT surety (per 1/10 lane- mile)* 0.0 ft L 0 1/10 mi. 2 Lanes $3,000.00 $0.00 29 VDOT inspection fee (per 1/10 mile)* 0.0 ft L 0 1/10 mi. $500 +$125 *1/10 centerline mils $125.00 $0.00 30 VDOT admin. cost recovery fee(per center lane 1 0.0 ft L 0 1/10 mi. $500 +$250 *1/10 centerline mill $250.00 $0.00 Cost sum $32,211.76 project management 15% $4,831.76 subtotal $37,043.53 contigency 10% $3,704.35 Total 1 $40,800 8/19/2010