Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO201000051 Review Comments Bond Estimate 2010-08-25
PROJECT NAME: First Baptist Church Covesville FILE #: WPO201000051 DATE APPROVED: 25- Aug -10 Item Unit Amount Unit Cost Subtotal site clearing acre 0 $7,100.00 $0.00 dam const.on site material cubic yard 0 $4.00 $0.00 dam const.off site material cubic yard 0 $15.00 $0.00 Trees & Shrubs seedlings planted with tubes 0 $12.50 $0 bioretention construction wq treatment volume in cf 0 $6.40 $0 trees & shrubs ball/burlap planted $100.00 $0 wetland plants planted 0 $2.00 $0 wetland seed mix acre 0.1 $1,500.00 $150 stream stabilization linear foot 0 $50.00 $0 underdrain stone cubic yard 30 $17.00 $510 biofilter surface area/ 27* 1' dept stone delivery load 1 $45.00 $45 underdrain pipe, 4" PVC linear foot 50 $1.35 $68 filter fabric square yard 33 $10.00 $330 biofilter surface area/ 27* 1' dept sand /soil mixture cubic yard 70 $20.00 $1,400 biofilter surface area/ 27* 2' dept Filterra 4x6 each 0 $6,400.00 $0 Filterra 4x8 each 0 $6,900.00 $0 Filterra 6x6 each 0 $7,100.00 $0 Filterra 6x8 each 0 $9,500.00 $0 Filterra 6x10 each 0 $12,100.00 $0 Filterra 6x12 each 0 $14,200.00 $0 Filterra Installation per project 0 $0 EC -1 outlet protection each $200.00 $0 class 1 rip -rap square yard 0 $55.00 $0 class 2 rip -rap square yard 0 $110.00 $0 48" concrete riser structure each 0 $1,000.00 $0 Stream Buffer Sign Installed each 0 $50.00 $0 EC -2 EC -3 ditch stabilization linear foot 300.00 $10.00 $3,000 maintenance road linear foot 0.00 $8.00 $0 Concrete pipe linear foot $25.00 $0 EC -3, EC -2 matting square yard 0.00 $10.00 $0 gabions, class 1 rip -rap square yard 0.00 $165.00 $0 concrete anti vortex each $1,500.00 $0.00 paved concrete ditch linear foot 0.00 $55.00 $0 embankment improvements each 0.00 $5,000.00 $0 pavement demolition square yard $5.00 $0 green roof square foot 0.00 $12.00 $0 turf stone(porous pavement) square foot $5.00 $0 RCP underground detention cubic foot installed $7.00 $0 Conser Easement RR > 50% acre 0.00 $39,000.00 $0 Conser Easement RR < 50% acre 0.00 $25,000.00 $0 Pond drain gate valve (6 ") each 0.00 $500.00 $0 Delaware Sand Filter linear foot installed $706.00 $0 Flow Splitter each installed $2,000.00 $0 subtotal $5,503 project management 825 subtotal $6,328 10% Contingency $633 TOTAL $6,961 ROUNDED TOTAL $7,000 min total after reduction $1,400