Loading...
HomeMy WebLinkAboutSDP201000060 Review Comments Final Site Plan and Comps. 2010-08-24Megan Yaniglos From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Tuesday, August 24, 2010 9:45 AM To: Megan Yaniglos Subject: Luckstone SDP - 2010 -00060 Final Site Plan Megan, I have reviewed the subject plan and have the following comments: 1. I recommend that an expansion joint is installed between the existing asphalt and proposed hydraulic cement concrete entrance. 2. Include the proposed entrance profile for the entrance in accordance with the standard CG -11 commercial entrance standard. 3. Sight distance needs to be in accordance with Appendix F of the VDOT Road Design Manual. The SDL is 500 and SDR is 530 feet. 4. A Land Use Permit will be required for any construction within the Route 250 Right of Way and will be issued by the VDOT Zion's Road Office once the site plan is approved by Albemarle County. Please let me know if there are any questions. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 ioel . den unzioCcbvdot.vir4inia.00v