Megan,
I have reviewed the subject plan and have the following comments:
1. I recommend that an expansion joint is installed between the existing asphalt and proposed hydraulic cement
concrete entrance.
2. Include the proposed entrance profile for the entrance in accordance with the standard CG -11 commercial entrance
standard.
3. Sight distance needs to be in accordance with Appendix F of the VDOT Road Design Manual. The SDL is 500 and
SDR is 530 feet.
4. A Land Use Permit will be required for any construction within the Route 250 Right of Way and will be issued by the
VDOT Zion's Road Office once the site plan is approved by Albemarle County.
Please let me know if there are any questions.
Thanks
Joel
Joel DeNunzio, P.E.
VDOT Culpeper
Land Development
434 - 589 -5871
ioel . den unzioCcbvdot.vir4inia.00v