Loading...
HomeMy WebLinkAboutWPO201000006 Review Comments Bond Estimate 2010-08-24BOND ESTIMATE - EROSION CONTROL Spreadsheet last revised:12 -5 -01 PROJECT NAME: Force Main and Gravity Sewer Project - Amended with WPO201000054 PROJECT NUMBER: WPO201000006 DATE OF ESTIMATE: 08/24/10 ESTIMATE BY: MRG BASED ON: Final approval WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 20.3 1500 30450 SILT FENCE LF 7600 5 38000 SAFETY FENCE LF 0 3 0 TEMPORARY FILL DIVERSION LF 2720 3 8160 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 200 20 4000 SEDIMENT TRAP 1 ACRES 1.36 1000 1360 SEDIMENT TRAP 2 ACRES 2.18 1000 2180 SEDIMENT TRAP 3 ACRES 2.9 1000 2900 SEDIMENT TRAP 4 ACRES 2.91 1000 2910 SEDIMENT TRAP 5 ACRES 2.98 1000 2980 SEDIMENT TRAP 6 ACRES 1.14 1000 1140 SEDIMENT TRAP 7 ACRES 0.6 1000 600 CULVERT INLET PROTECTION EA 9 500 4500 INLET PROTECTION EA 10 200 2000 OUTLET PROTECTION EA 3 200 600 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 CONSTRUCTION ENTRANCE EA 7 2000 14000 subtotal 115780.00 project management 17367.00 subtotal 133147.00 CONTINGENCY LS 10% 13314.70 TOTAL 146461.70 BOND AMOUNT REQUIRED 146500.00