Loading...
HomeMy WebLinkAboutARB201000087 Review Comments Preliminary Site Plan 2010-09-27ARCHITECTURAL REVIEW BOARD STAFF REPORT Project #/Name ARB- 2010 -87: Avinity Preliminary Site Development Plan Review Type Preliminary Review of a Site Development Plan Parcel Identification Tax Map 91, Parcel 14 Location 1785 Avon Street Extended, on the east side of Avon Street Extended adjoining the (southwest) side boundary of Approved Cale Elementary School Zoned Planned Residential Development (PRD), Entrance Corridor (EC) Owner/Applicant Avon Properties LLC, Collins Engineering (Scott Collins) representative Magisterial District Scottsville Proposal To construct a residential development consisting of 100 townhouses, a multi -story 24 unit condominium building, clubhouse and associated site improvements on a 9.24 acre parcel. Context The proposed development is located on the Avon Street Extended (State Route 742) Entrance Corridor. This • Remove the system of retaining walls corridor is moderately dense in development and is characterized by a mix of single family, multi - family, commercial and light industrial uses. Visibility The proposed development is located on a parcel approximately 1,000' deep adjoining the southeast side of the • Revise road sections regarding width, on- street parking and Corridor. Sheet 3 Site Plan delineates the four phases of development. The front (northwest) and side elevations of Units 1 - 10 in Phase II are expected to be highly visible due to their close proximity to the Corridor. The rear (southwest) elevations of Units 19 - 26 are expected to be visible due to their proximity to the Corridor and the lack of existing vegetation to remain in between. Views of the clubhouse, other townhouses and the condominium building are expected to be limited to general shapes, colors and forms. ARB Meeting Date October 4, 2010 Staff Contact Brent Nelson Project History DATE APPLICATION/REVIEW TYPE RESULT 9/9/10 (received) SDP 2010 -72, Final Site Development Plan Under review 5/27/10 SDP 2010 -24, Preliminary Site Development Plan Approved 3/26/10 Variation Request (SDP 2010 -24, ZMA 2006 -5) for: Approved • Change from 80 condos /44 townhouses to 24 condos /100 townhouses • Modify the amenity package (clubhouse) • Remove the system of retaining walls • Reorient the units and private streets • Revise road sections regarding width, on- street parking and ANALYSIS REF sidewalks • Add a new road ISSUE 6/25/07 SDP 2007 -66, Final Site Development Plan Withdrawn 6/13/07 ZMA 2006 -5, Rezoning request Approved 4/9/07 ARB 2007 -11, Advisory Review for a Rezoning No objection with conditions (Attachment A) ANALYSIS REF GUIDELINE ISSUE RECOMMENDATION Structure design 9 Building forms and features, including Sheet 8 Elevations contains front, rear and Revise the configuration and size of the roofs, windows, doors, materials, colors side elevations for building Type A proposed building footprints for Units 1 - 10 so they and textures should be compatible with in the northwest corner of the development match the elevations submitted. Provide the forms and features of the significant (Phase 2). The configuration and size of the rear elevations of Units 19 - 26 that historic buildings in the area, exemplified footprints for Units 1 - 10 do not match the correspond with the building footprint. by (but not limited to) the buildings elevations. The configuration, size and Revise the proposal by showing three described in Appendix B. The standard number of units in the footprint for Units 19 different, but complementary, paint colors of compatibility can be met through - 26 do not match the elevations submitted. for Units 1 - 26. Revise the building Type scale, materials, and forms which may be A elevations by labeling for proposed embodied in architecture which is The applicant's memo states the elevations materials and colors. contemporary as well as traditional. The will be comprised of Old Virginia Brick replication of important historic sites in Poplar Forest, HardiePlank siding in Harris Albemarle County is not the objective of Cream, asphalt shingle roofs in Timberline these guidelines. Charcoal, white trim, black shutters, white columns and white railings. The proposed 12 Architecture proposed within the materials and colors blend well and Entrance Corridor should use forms, complement each other; however, the sole shapes, scale, and materials to create a use of the Harris Cream siding color only cohesive whole. accentuates the significant length of these buildings. Revising the proposal by showing three different, but complementary, colors would add needed interest, mitigating the buildings' lengthy appearance. The rear (southwest) elevations of Units 19 - Revise the design of the rear elevations of 26 have a monolithic, repetitive and Units 19 - 26 to appear more as if they "backdoor" appearance. Sheet 5 Landscape front on the entrance road (Avinity Drive). Plan shows a hedge of Steeds Holly planted This could be accomplished with the along the rear (southern) boundary of these addition of gable roof forms, variation in REF GUIDELINE ISSUE RECOMMENDATION buildings. The 5' to 7' mature height of these the size and placement of windows, and plantings is not expected to screen EC views variation in the porch designs. of these elevations. Revising their design to make them appear as if they front on the entrance road ( Avinity Drive) would be more appropriate. Changes to the design of the rear elevation might include the addition of gable roof forms, variation in the size and placement of windows, and variation in the porch designs. Sheet 10 Elevations contains front and rear Provide for review the side (northwest) elevations of building Type B proposed in elevations of Units 39, 69 and 57, labeled Phases 1 and 3 of the development. The for materials and colors. proposed materials and colors blend well with each other and the variation in their use provides added interest, helping to mitigate the lengthy appearance of these buildings. The side (northwest) elevations of Units 39, 69 and 57 are the most visible of Phase 1 from the EC; however, they were not included in this submission. Buildings of Type B are expected to have impact only in terms of general form, materials and colors due to their distance from, and elevation below, the EC. Sheet 11 Building Plans & Clubhouse Revise the clubhouse elevation by labeling Elevation contains a front (northwest) for proposed materials and colors. Provide elevation of the proposed clubhouse /pavilion a sample of the General Shale Virginia located approximately 380' east of the EC at Highlands brick proposed for this building. the end of Avinity Drive. This building is Revise the gable roof design above the side expected to be visible; however, only the wings so as to appear more proportionate general form, materials and colors are with the main roof form. Increase the size expected to have an impact due to its of the lunette in the center pediment and distance from the EC. The applicant's memo reduce the size of the lunette in the indicates that General Shale Virginia pediments of the side wings to be more Highlands brick will be used; however, other proportionate. material identification and samples were not REF GUIDELINE ISSUE RECOMMENDATION provided so their appropriateness could not be evaluated. The gable roofs over the side wings of the structure appear disproportionately small with the rest of the building. The proposed lunette in the center pediment is disproportionately small, while the lunettes in the side pediments appear too large. Sheet 3 Site Plan shows the footprint of a 24 Provide sketch elevations of the 24 unit unit condominium building at the east end of condominium building with material /color the site approximately 900' from the EC. The selections showing general building /roof applicant's memo indicates the building will forms and mechanical equipment locations. not exceed 4 stories and will use the same General Shale Virginia Highlands brick proposed for the clubhouse building. Only the general form and colors of this structure are expected to have an impact due its significant distance from the EC. The applicant has verbally indicated that the building design has not been developed at this time. Given the anticipated visibility from the EC, sketch elevations with color /material selections showing general building /roof forms and mechanical equipment locations may suffice. Accessory structures and equipment 17 The following should be screened to The location and method of concealment of Revise all applicable drawings to show the eliminate visibility from the Entrance mechanical equipment for all buildings location and method of concealment for all Corridor street: visible from the EC was not provided with mechanical equipment proposed for Units a. Loading areas, this application. 1 - 10, 19 - 26 and the clubhouse. b. Service areas, c. Refuse areas, Sheet 3 Site Plan shows a proposed fence Revise all applicable drawings by d. Storage areas, along the entire perimeter of the parcel. The removing the fence line shown along the e. Mechanical equipment, applicant has verbally indicated the fence Avon Street Extended right -of -way. f. Above - ground utilities, and line shown adjacent to the Avon Street Provide a detail of the proposed privacy g. Chain link fence, barbed wire, razor Extended right -of -way was a drafting error. fence including materials proposed, wire, and similar security fencing Details of the proposed fence, including method of construction and proposed devices. materials, colors and height, were not colors; wood materials with dark earth tone REF GUIDELINE ISSUE RECOMMENDATION included with this submission. The applicant colors of brown and grey would be 18 Screening devices should be compatible has verbally indicated the fence would be a acceptable. with the design of the buildings and 6' tall wooden privacy fence. Dark earth tone surrounding natural vegetation and may colors of brown and grey are generally consist of: considered acceptable. a. Walls, b. Plantings, and The north side of the fence proposed between Shift the location of the fence proposed c. Fencing. Phase 1 and Cale Elementary and the south between Phase 1 and Cale Elementary and side of the same fence adjacent to Unit 1 are the fence proposed along the southern expected to be highly visible. The fence line parcel boundary, parallel with Avinity proposed along the portion of the southern Drive, a minimum of 6' inside the property parcel boundary that is parallel with Avinity line to allow for plantings between the Drive is also expected to be visible on both fence and the boundary. Revise the sides. Visibility in both locations is due to landscape plan to show plantings in the lack of existing significant vegetation to intermittent masses on the north side of the remain, lack of proposed planting and the fence next to Cale Elementary, south side close proximity of the fence to the EC. of the fence adjacent to Unit 1, and north Planting in intermittent masses on both sides and south sides of the fence along the of these fences would help to mitigate the southern boundary parallel with Avinity visual impact of their length. This would Drive. require that the fences be set back sufficiently to allow room for the planting; a minimum distance of 6' inside the property line is recommended. In addition, varying the horizontal alignment of the fences to create projections, as viewed from the EC, could further assist in minimizing the visual impact of their length. Landscaping 27 Landscaping along the frontage of Sheet 5 Landscaping Plan shows 8 Red Revise the Planting Schedule to show a 3 Entrance Corridor streets should include Maple trees adjacent to the Avon Street 1 /2" caliper for the proposed Red Maple EC the following: Extended right -of -way planted at 21/2" frontage trees. Provide evidence that these a. Large shade trees should be planted caliper instead of 31/2" caliper. They are trees would be permitted, undisturbed, parallel to the Entrance Corridor Street. proposed underneath existing overhead lines within the overhead utility easement or Such trees should be at least 31/2 inches and their mature height is expected to exceed provide an alternate species and/or location caliper (measured 6 inches above the the height of these lines. The location of that would meet the requirements of an EC ground) and should be of a plant species these lines is not shown on any of the frontage tree. Revise the landscape common to the area. Such trees should be drawings included in this submission. proposal by showing flowering ornamental located at least every 35 feet on center. Evidence that the trees would be permitted, trees interspersed amongst the Red Maple REF GUIDELINE ISSUE RECOMMENDATION b. Flowering ornamental trees of a undisturbed, within the easement was not frontage trees and shrubs, 24" tall at species common to the area should be provided with this application. The standard planting, integrating Units 1 - 10 with the interspersed among the trees required by note regarding their pruning is not included overall landscape plan, mitigating the the preceding paragraph. on the landscape plan. Flowering ornamental appearance of their length as viewed from d. An area of sufficient width to trees and shrubs are not provided as required the Corridor. Revise Sheet 5 Landscaping accommodate the foregoing plantings by the Guidelines. The front yards of Units 1 Plan by removing the hard surface area and fencing should be reserved parallel to - 5 are mistakenly designated as hard surface mistakenly shown in the front yards of the Entrance Corridor street, and on the plan. Units 1 - 5 and include the following note: exclusive of road right -of -way and utility All site plantings of trees and shrubs shall easements. be allowed to reach, and be maintained at, mature height, the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 28 Landscaping along interior roads: Proposed trees along the interior roads Revise Sheet 5 Landscaping Plan by a. Trees should be planted parallel to all (Avinity Loop and Avinity Court) exceed the reducing the spacing of proposed trees interior roads. Such trees should be at required spacing. along interior roads (Avinity Loop and least 21/2 inches caliper (measured six Avinity Court) so as not to exceed 40'. inches above the ground) and should be of a plant species common to the area. Such trees should be located at least every 40 feet on center. Site Grading 37 Cut and fill slopes should be rounded Some of the proposed grading along the Revise Sheet 4 Grading & Drainage Plan (minimum ten foot radius) to meet north and south (side) parcel boundaries does so that all proposed cut and fill slopes adjacent conditions. not meet the 10' minimum radius to meet the along the north and south side parcel adjacent condition. boundaries are rounded to a minimum 10' radius to meet the adjacent site. 38 No grading, trenching, or tunneling Sheet 4 Grading & Drainage Plan does not Revise Sheet 4 Grading & Drainage Plan should occur within the drip line of any show proposed (revised) tree lines along the to show the location of proposed (revised) trees or other existing features designated northern (side) parcel boundary. The location tree lines along the northern (side) parcel for preservation in the final Certificate of and method of tree protection is not indicated boundary; include the location and method Appropriateness. in this application. of tree protection proposed. 39 Areas designated for preservation in the final Certificate of Appropriateness should be clearly delineated and protected on the site prior to any grading activity on the site. This protection REF GUIDELINE ISSUE RECOMMENDATION should remain in place until completion of the development of the site. 40 Preservation areas should be protected from storage or movement of heavy equipment within this area. SUMMARY OF RECOMMENDATIONS Staff recommends the following as the primary points of discussion: 1. The proposed paint color for building Type A. 2. The repetitive and "backdoor" appearance of the rear (southwest) elevations of Units 19 - 26. 3. The gabled roofs over the side additions and proposed lunettes of the clubhouse. 4. Materials, colors, planting and alignment of the fence. Staff offers the following comments on the Preliminary Site Plan: 1. Revise the configuration and size of the building footprints for Units 1 - 10 so they match the elevations submitted. Provide rear elevations of Units 19 - 26 that correspond with the building footprint. Revise the proposal by showing three different, but complementary, paint colors for Units 1 - 26. Revise the building Type A elevations by labeling for proposed materials and colors. 2. Revise the design of the rear elevations of Units 19 - 26 to appear more as if they front on the entrance road ( Avinity Drive). This could be accomplished with the addition of gable roof forms, variation in the size and placement of windows, and variation in the porch designs. 3. Provide for review the side (northwest) elevations of Units 39, 69 and 57, labeled for materials and colors. 4. Revise the clubhouse elevation by labeling for proposed materials and colors. Provide a sample of the General Shale Virginia Highlands brick proposed for this building. Revise the gable roof design above the side wings so as to appear more proportionate with the main roof form. Increase the size of the lunette in the center pediment and reduce the size of the lunette in the pediments of the side wings to be more proportionate. 5. Provide sketch elevations of the 24 unit condominium building with material/color selections showing general building /roof forms and mechanical equipment locations. 6. Revise all applicable drawings to show the location and method of concealment for all mechanical equipment proposed for Units 1 - 10, 19 - 26 and the clubhouse. 7. Revise all applicable drawings by removing the fence line shown along the Avon Street Extended right -of -way. Provide a detail of the proposed privacy fence including materials proposed, method of construction and proposed colors; wood materials with dark earth tone colors of brown and grey would be acceptable. 8. Shift the location of the fence proposed between Phase 1 and Cale Elementary and the fence proposed along the southern parcel boundary, parallel with Avinity Drive, a minimum of 6' inside the property line to allow for plantings between the fence and the boundary. Revise the landscape plan to show plantings in intermittent masses on the north side of the fence next to Cale Elementary, south side of the fence adjacent to Unit 1, and north and south sides of the fence along the southern boundary parallel with Avinity Drive. 9. Revise the Planting Schedule to show a 31/2" caliper for the proposed Red Maple EC frontage trees. Provide evidence that these trees would be permitted, undisturbed, within the overhead utility easement or provide an alternate species and/or location that would meet the requirements of an 7 EC frontage tree. Revise the landscape proposal by showing flowering ornamental trees interspersed amongst the Red Maple frontage trees and shrubs, 24" tall at planting, integrating Units 1 - 10 with the overall landscape plan, mitigating the appearance of their length as viewed from the Corridor. Revise Sheet 5 Landscaping Plan by removing the hard surface area mistakenly shown in the front yards of Units 1 - 5 and include the following note: All site plantings of trees and shrubs shall be allowed to reach, and be maintained at, mature height, the topping of trees is prohibited. Shrubs and trees shall be pruned minimally and only to support the overall health of the plant. 10. Revise Sheet 5 Landscaping Plan by reducing the spacing of proposed trees along interior roads ( Avinity Loop and Avinity Court) so as not to exceed 40'. 11. Revise Sheet 4 Grading & Drainage Plan so that all proposed cut and fill slopes along the north and south side parcel boundaries are rounded to a minimum 10' radius to meet the adjacent site. 12. Revise Sheet 4 Grading & Drainage Plan to show the location of proposed (revised) tree lines along the northern (side) parcel boundary; include the location and method of tree protection proposed. APPENDIX A This report is based on the following submittal items: Sheet # Drawing Drawin Date/Revision Date 1 Title Sheet Revision date 8/23/10 2 Existing Conditions and Limits Plan Revision date 8/23/10 3 Site Plan Revision date 8/23/10 4 Grading & Drainage Plan Revision date 8/23/10 5 Landscaping Plan and Calculations Revision date 8/23/10 6 Landscaping Notes and Details Revision date 8/23/10 7 Site Sections From Avon Street Extended Received 8/23/10 8 Elevations Revision date 8/9/10 9 Building Plans Revision date 8/9/10 10 Elevations Revision date 8/9/10 11 Building Plans and Clubhouse Elevations Revision date 8/9/10 Exterior Color/Materials List (Units 69 -74) Received 8/23/10 Project Narrative Received 8/23/10 Perspectives/Elevations Color Perspective Rendering of Unit A Received 8/23/10 Color Front Elevation of Unit B Received 8/23/10 Color Rear Elevation of Unit B Received 8/23/10 Aerial View Of Site Taken From Google Maps Received 8/23/10 Floor Plans Lot 69: First, Second and Third Floor Plans Received 8/23/10 Photos View From Entrance Corridor Looking South Received 8/23/10 View From Entrance Corridor Looking Directly at Site (Facing East) Received 8/23/10 View From Entrance Corridor Looking Northeast Received 8/23/10 Materials /Colors Siding Sample: HardiePlank Harris Cream Received 8/23/10 10 Siding Sample: HardiePlank (grey color) Received 8/23/10 Siding Color: Craig Putty Received 8/23/10 Siding Color: Dark Beige Received 8/23/10 Brick: Tan Brandon Received 8/23/10 Brick: Red Poplar Forest Received 8/23/10 Shutter/Door Color: Black Green (custom color) Received 8/23/10 Shutter/Door Color: Deep Green (custom color) Received 8/23/10 Roof Shingle: Dark Grey Asphalt (no product ID) Received 8/23/10 Product Brochures Garage Doors: Wayne Dalton, Models 9100 & 9600 Received 8/23/10 Windows: SilverLine, Series 2200 Received 8/23/10 Door: Old Trail Town Homes, Front Door Submittal: Masonite Belleville Warranty; Masonite Belleville Brochure FrameSaver Warranty Received 8/23/10 10 Attachment A ��oF AL$� ti �IRGINZ�FJ COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4012 April 9, 2007 Mark Keller Terra Concepts 224 Court Square Charlottesville, VA 22902 RE: ARB- 2007 -11: Avinity - Advisory Review for a Rezoning Tax Map 91, Parcel 14; Tax Map 90 Parcels 351, 35J, 35K Dear Mr. Keller: The Albemarle County Architectural Review Board, at its meeting on March 19, 2007, completed a preliminary review of the above -noted request. The Board took the following actions. Regarding the Rezoning Request, the Board by a vote of 5:0, forwarded the following recommendation to the Planning Commission: The ARB has no objection to the proposed rezoning, noting the following: 1. The architectural designs of the townhouses require significant changes to the EC elevations and the side elevations to make them acceptable for the EC. The proposed elevations should not be considered approved with the rezoning. 2. Avon Street planting shall meet ARB guidelines, with tree species chosen to accommodate overhead utilities. The biofilter north of unit 21 shall be planted to be fully integrated into the surrounding landscape. Biofilter planting is subject to ARB approval with the landscape plan as part of final site plan approval. Planting illustrated on the application plan should not be considered approved with the rezoning. 3. Covenants should be established for architectural policy (paint color, materials, etc.) regarding any units facing the Entrance Corridor, specifically, the west and end elevations of units 12 — 21 and the south facing elevations of units 1 — 11. 11 Regarding the Preliminary Site Plan, the Board made the following comments and suggestions for the benefit of the applicant's next submittal. 1. EC planting shall meet the ARB Guidelines, with tree species selected to accommodate overhead utilities. Include on the plan biofilter plants that are fully integrated with the surrounding landscaping. 2. Revise the building design to include architectural detailing to provide more interest and less of a flat appearance for the fagade. 3. Revise the architectural design of the side elevations to relieve the blankness of units 11, 12 and 21. Provide additional windows. Consider a porch that wraps the corner 4. Reconsider the proportion of window to wall. 5. If divided lights are used in the windows, reconsider the consistency of the proportions of the divided lights. 6. Variation in materials could be considered. 7. Add context in the elevations as seen from Avon Street. 8. Provide VDOT correspondence regarding their approval to allow plantings in their right -of -way. You may submit your application for continued ARB review at your earliest convenience. Application forms, checklists and schedules are available on -line at www.albemarle.org /planning. Revised drawings addressing the comments listed above are required. Include updated ARB revision dates on each drawing. Please provide a memo including detailed responses indicating how each comment has been addressed. If changes other than those requested have been made, identify those changes in the memo also. Highlighting the changes in the drawing with "clouding" or by other means will facilitate review and approval. If you have any questions concerning any of the above, please feel free to call me. Sincerely, Margaret M. Maliszewski Design Planner Planning Division MMM /aer Cc: Avon Properties LLC P O Box 520, Crozet, VA 22932 Elaine Echols File 12