Loading...
HomeMy WebLinkAboutWPO201000041 Review Comments Erosion Control Plan 2010-09-24� OF AL ,. vIRGI1`IZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: Old Trail Village Block 4 (WPO- 2010 - 00041) Plan preparer: Mr. Scott Collins, PE; Collins Engineering Owner or rep.: March Mountain Properties I, LLC Plan received date: 16 August 2010 Date of comments: 24 September 2010 Reviewer: Phil Custer The first submittal of the Old Trail Block 4 site ESC plans (WPO- 2010 - 00041), received 11 August 2010, have been reviewed. Engineering can approve the plan after the following comments have been addressed. 1. A detail for a clearwater diversion has been provided on sheets ESC -1 and ESC -4 but does not appear to be shown on the plan. A cleanwater diversion is not a state approved standard and must be given a variance by the County Engineer. Please either remove this detail from the set or request a variance from the County Engineer to allow this method and show how the cleanwater diversion is to be utilized. 2. This ESC plan is currently reliant on at least two other active ESC plans (three if the Block 2 plan is approved and a grading permit is given for it). On all plan view ESC sheets and the cover sheet, please provide the following note: This ESC plan relies on sediment trapping measures of other Old Trail ESC plans. In phase I of the ESC plan, disturbed area will drain to the sediment basin approved in WPO- 2008 - 00106. When the stormsewer structures are installed in phase 2, construction runoff will be directed to Sediment Basin 1 approved in WPO- 2008 - 00014. These plans must remain active until the grading permit for Block 4 is terminated. Please also identify these two plans in the first step of the construction sequence. 3. The drainage area to ST1 does not correlate to the existing topography as drawn and the resulting acreage is likely over the 3 acre maximum for a sediment trap. Also, the elevations used in the trap calculations do not match the topography shown on the ESC plan. It appears trap 1 of WPO- 2008 -00106 was simply relocated 140ft south. Please update the drainage area and calculations accordingly. 4. There is a tract of land south of the sewer line 8 -6 -5 where no ESC measures are provided. Please move the limits of construction to 1Oft off this sewer line and provide silt fence on the downhill side until the construction of the sewer line is within the drainage area to the sediment basin of WPO- 2008 - 00106. 5. Please extend the silt fence downhill of the sewer line 2 -2A to the top of the Sediment basin embankment. 6. Please show the northern diversion of WPO- 2008 -00106 and demonstrate how the sewer line is to be constructed in the vicinity. 7. In phase 2, please provide silt fence on the north and west sides of the block at the edge of the sidewalk. 8. Please include the updated County ESC notes from the latest edition of the design manual, Albemarle County Community Development Engineering Review Comments Page 2 of 2 available online. 9. A bond amount will be computed by the County when the plans have been approved.