HomeMy WebLinkAboutWPO201000038 Review Comments Erosion Control Plan 2010-09-16Philip Custer
From: Philip Custer
Sent: Thursday, September 16, 2010 12:35 PM
To: 'djensen @wwassociates.net'; 'MG CPCM @AOL.COM'
Cc: Gerald Gatobu; Ana Kilmer; Kenny Thacker; Andrew Lowe
Subject: Engineering approval of Avemore Phase IV (SDP- 2010 -00054 and WPO- 2010 - 00038)
Good afternoon,
Engineering has reviewed the latest submittal of the Avemore Phase IV site and ESC plans (SDP- 2010 -00054 and WPO-
2010- 00038), received 14 September 2010. All outstanding engineering comments have been addressed and the ESC
plans are hereby approved. Engineering review offers no objection to the approval of the site plan but requests the
applicant review the handicap ramps at the entrance to the site and consider whether a Type B CG -12 would be more
appropriate since the 4ft sidewalk around the ramp normally associated with a Type A is not provided.
Please provide me with two more copies of the set so that I can pass the file to the County WPO Inspector assigned to
this site. Gerald will require additional copies be delivered to him when he determines the site plan can be submitted
for signature.
The ESC Bond has been computed to be $19,500. To post the ESC bond, please contact Ana Kilmer at 296 -5832 x3246
after reviewing the bond information available online.
Once the site plan has been signed, the ESC bond posted, and the first year permit and inspection fee is paid, please
contact Kenny Thacker (x3390) or Andy Lowe (x3245) at 296 -5832 to set up a pre- construction meeting.
Please contact me if you have any questions.
Thanks,
Phil
296 -5832 x3072