Loading...
HomeMy WebLinkAboutWPO201000038 Review Comments Bond Estimate 2010-09-16BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Avemore Phase IV W PO- 2010 -00038 09/16/10 PBC Plan signed 9/10/2010 f WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 2.6 1500 3900 SILT FENCE LF 1080 5 5400 SAFETY FENCE LF 3 0 DIVERSION DIKE LF 180 3 540 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 2.15 1000 2150 INLET PROTECTION EA 7 200 1400 OUTLET PROTECTION EA 0 200 0 EC -2 & 3 DITCH PROTECTION LF 0 10 0 RIP -RAP LF 0 55 0 CHECK DAMS SQ.YD. 0 30 0 PAVED CONSTRUCTION ENTRANCE EA 1 2000 2000 subtotal 15390.00 project management 2308.50 subtotal 17698.50 CONTINGENCY LS 10% 1769.85 TOTAL 19468.35 BOND AMOUNT REQUIRED 19500.00 last revised:12 -5 -01