HomeMy WebLinkAboutSUB200900062 Review Comments Critical Slope Waiver 2010-10-136A -& County of Albemarle Department of Community Development Memorandum To: Summer Frederick, Current Development planning and zoning review From: Phil Custer, Current Development engineering review Date: 13 October 2010 Subject: Wickham Pond Phase H Critical Slope Waiver Request (SUB- 2009 - 00062) The critical slope waiver request has been reviewed. The engineering analysis of the request follows: Description of critical slope area and proposed disturbance: The applicant is requesting a waiver to disturb critical slopes to develop the parcels in accordance with ZMA- 2005- 00018. The disturbance to critical slopes is needed to grade the site for buildings, roads, and driveways as well as to install a sanitary sewer line. The alignment of the roadways and lot layout match the approved rezoning plan and the plan appears to be in compliance with the overlot grading plan proffer. This will be verified during the review of the road and ESC plans, prior to the approval of the final subdivision plat. TMP 56 -91 and TMP 56 -91B Areas Acres Total site 19.551 total acres approximately Critical slopes 1.07 ac.* 5.47% of site Critical slopes disturbed 0.03 ac.* 2.8% of critical slopes *These figures have been provided by the applicant in his request letter. However, after reviewing the topographic information on sheet C -2, it is evident that more critical slopes exist on the property and are being disturbed than claimed. For instance, the northern side of the Swale 40ft south of the existing structure appears to be a notable strip of critical slopes. The increased amount of critical slope disturbance has no effect on engineering's analysis of the waiver request. Exemptions to critical slopes waivers for driveways, roads and utilities without reasonable alternative locations: The disturbance to critical slopes necessary to construct public sanitary sewer facilities is exempt from preservation if the county engineer determines that no reasonable alternative exists. Compliance with Zoning Ordinance 18 -4.2: ,'movement of soil and rock" Proper slope construction, control of drainage, and vegetative stabilization will prevent any movement of soil. "excessive stormwater runoff' A stormwater management plan must be approved for this project prior to construction. The plan will collect as much of the runoff as possible and direct it to Stormwater Management facilities. "siltation" Inspection and bonding by the County will ensure siltation control during construction. Proper stabilization and maintenance will ensure long term stability. Albemarle County Community Development Engineering Review comments Page 2 of 2 "loss of aesthetic resource" The critical slopes do not appear to be an aesthetic resource. "septic effluent" This development will be served by public sewer. Engineering review has no objection to the approval of this waiver. file: EI_csw_PBC_Wickham Pond Phase lI critical slope waiver engineering analysis.doc