Loading...
HomeMy WebLinkAboutWPO201000060 Review Comments Erosion Control Plan 2010-09-21ALg�,�� �'IRGINZ� COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 Fax (434) 972 -4126 Project: WPO- 2010 - 00060, Animal Wellness Center Plan preparer: Mr. Jim Taggart, PE; TCS Engineering Company, LLC Owner or rep.: Mr. Henry Smith Date received: 15 September 2010 (plan received 27 August 2010) Date of Comment: 21 September 2010 Engineer: Phil Custer The ESC plan for the Animal Wellness Center (WPO- 2010 - 00016), received on 15 September 2010, has been reviewed. The applicant has been notified that the site is no longer exempt from Stormwater detention requirements because of the increased limits of disturbance. The site plan cannot be approved until this issue is addressed. One option includes providing detention on site. If this is chosen by the applicant, a fee for SWM review will be required. Engineering review can approve the ESC plan once the following comments are addressed. 1. All offsite construction easements are needed before the plan can be approved. 2. Please provide the latest edition of the County's General Construction ESC notes. These notes can be found in the design manual online. 3. Please include an " Offsite Areas" section in the ESC narrative. Please state that all offsite soil will come from a borrow area with an active grading permit. 4. The sediment trap calculations do not match the contours on the plan. The topography is also incorrectly drawn with regard to the 660 contours. I have attached a sketch with revised grading that maximizes the volume of the facility given the confined space. My grading still falls short of the required volume by 10 -25 %. Rather than require the facility to expand further south into the area of the county pipe, engineering review will grant a variance if the upstream culvert inlet protection was designed as a CIP -trap (per VESCH Plate 3.08 -2) with a stone weir and a volume is equal to the shortfall of the downstream trap. Please modify the trap grading, add CI -trap grading, and label the contours of both traps. 5. An ESC bond will be computed by the county at the time of WPO plan approval. File: El_esc_PBC _ wpo- 2010 -00060 Animal Wellness.doc