Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
WPO200900067 Review Comments Bond Estimate 2010-09-22
BOND ESTIMATE - EROSION CONTROL last revised:12 -5 -01 PROJECT NAME: NORTH POINTE COMMUNITY - NORTH ENTRANCE - RT. 29 ROADWAY IMPROVEMENTS PLAN PROJECT NUMBER: WPO- 2009 -00067 DATE OF ESTIMATE: 09/22/10 ESTIMATE BY: PBC BASED ON: PLAN SUBMITTED 11 AUGUST 2010 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 3.85 1500 5775 SILT FENCE LF 1710 5 8550 SAFETY FENCE LF 3 0 TEMPORARY FILL DIVERSION LF 0 3 0 DIVERSION DIKE LF 0 3 0 TEMPORARY SLOPE DRAIN LF 0 20 0 SEDIMENT TRAP 1 ACRES 0 1000 0 SEDIMENT BASIN 1 ACRES 0 1000 0 CULVERT INLET PROTECTION EA 1 500 500 INLET PROTECTION EA 6 200 1200 OUTLET PROTECTION EA 2 200 400 EC -2 & 3 DITCH PROTECTION LF 1355 10 13550 RIP -RAP LF 50 55 2750 EC -2 SLOPE PROTECTION SQ.YD. 2500 10 25000 PAVED CONSTRUCTION ENTRANCE EA 0 2000 0 subtotal 57725.00 project management 8658.75 subtotal 66383.75 CONTINGENCY LS 10% 6638.38 TOTAL 73022.13 BOND AMOUNT REQUIRED 73100.00