HomeMy WebLinkAboutARB201000095 Review Comments Minor Amendment 2010-09-28�'IRGI1`�ZP
COUNTY OF ALBEMARLE
Department of Community Development
401 McIntire Road, North Wing
Charlottesville, Virginia 22902 -4596
Phone (434) 296 -5832
September 28, 2010
Ron Manslow
Security Vault Works, Inc.
122 Lafayette Avenue
Laurel, MD 20707
Re: ARB 2010 -95: BB &T Charlottesville /Seminole Trail
County Wide — Minor Amendment
TMP 06100 -00 -00 -13400
Dear Mr. Manslow,
Fax (434) 972 -4012
We have received the above -noted application and I have determined that it may be reviewed as a
county -wide Certificate of Appropriateness for a minor amendment. The following revisions are
requested to make the proposal consistent with the applicable design criteria.
1. Provide a high resolution color photo or rendering of the proposed ATM facility. The photo on
the display board included with the original application is blurry and not readable.
2. Revise Sheet A.1 Proposed ATM Building Layout and Front Elevation to:
a) Show the location of the proposed wall - mounted lighting. Include on the drawing the
manufacturer's name, product ID, color /finish and light source for the proposed light fixture.
The CADDY SM wall -mount fixture, included in the original application, can be approved
since it is a full cutoff style fixture. Please note the BRONZE CUP MD fixture is not a full
cutoff style and the proposed 70 watt MH bulb exceeds the 3,000 lumens threshold for full
cutoff requirement
b) Show the location of the existing wall -mount light at the end of the drive -thru canopy and
note if it is to remain or be removed.
c) Include a note that only the text BB &T24 and the ATM equipment screens /panels shall
illuminate internally.
d) Include a note that the color of the proposed vinyl awning will match the BB &T burgundy
color proposed for the ATM.
Within 15 days of the date of this letter, please send me a letter (by email is acceptable) indicating
whether you will or will not proceed with these revisions. If you choose not to proceed with these
revisions, staff will be unable to approve your application. If you choose to proceed with the
revisions, please forward me one set of revised drawings together with a memo summarizing the
revisions you've made. Your decision to make the revisions will suspend the 60 -day review period
associated with your original submittal. However, I expect to complete the review of your revised
proposal within 2 weeks of your re- submittal.
If you have any questions about this action, please contact me as soon as possible. I look forward to
receiving your revisions and completing this review with an approval letter.
Sincerely,
Brent W. Nelson, Landscape Planner
Albemarle County, Department of Community Development
401 McIntire Road, Charlottesville, VA 22902
434 - 296 -5832 x 3272
cc: Cavalier Country Bank
c/o BB &T Property Tax Compliance
P.O. Box 167
Winston - Salem, NC
27102 -0167
File