Loading...
HomeMy WebLinkAboutARB201000095 Review Comments Minor Amendment 2010-09-28�'IRGI1`�ZP COUNTY OF ALBEMARLE Department of Community Development 401 McIntire Road, North Wing Charlottesville, Virginia 22902 -4596 Phone (434) 296 -5832 September 28, 2010 Ron Manslow Security Vault Works, Inc. 122 Lafayette Avenue Laurel, MD 20707 Re: ARB 2010 -95: BB &T Charlottesville /Seminole Trail County Wide — Minor Amendment TMP 06100 -00 -00 -13400 Dear Mr. Manslow, Fax (434) 972 -4012 We have received the above -noted application and I have determined that it may be reviewed as a county -wide Certificate of Appropriateness for a minor amendment. The following revisions are requested to make the proposal consistent with the applicable design criteria. 1. Provide a high resolution color photo or rendering of the proposed ATM facility. The photo on the display board included with the original application is blurry and not readable. 2. Revise Sheet A.1 Proposed ATM Building Layout and Front Elevation to: a) Show the location of the proposed wall - mounted lighting. Include on the drawing the manufacturer's name, product ID, color /finish and light source for the proposed light fixture. The CADDY SM wall -mount fixture, included in the original application, can be approved since it is a full cutoff style fixture. Please note the BRONZE CUP MD fixture is not a full cutoff style and the proposed 70 watt MH bulb exceeds the 3,000 lumens threshold for full cutoff requirement b) Show the location of the existing wall -mount light at the end of the drive -thru canopy and note if it is to remain or be removed. c) Include a note that only the text BB &T24 and the ATM equipment screens /panels shall illuminate internally. d) Include a note that the color of the proposed vinyl awning will match the BB &T burgundy color proposed for the ATM. Within 15 days of the date of this letter, please send me a letter (by email is acceptable) indicating whether you will or will not proceed with these revisions. If you choose not to proceed with these revisions, staff will be unable to approve your application. If you choose to proceed with the revisions, please forward me one set of revised drawings together with a memo summarizing the revisions you've made. Your decision to make the revisions will suspend the 60 -day review period associated with your original submittal. However, I expect to complete the review of your revised proposal within 2 weeks of your re- submittal. If you have any questions about this action, please contact me as soon as possible. I look forward to receiving your revisions and completing this review with an approval letter. Sincerely, Brent W. Nelson, Landscape Planner Albemarle County, Department of Community Development 401 McIntire Road, Charlottesville, VA 22902 434 - 296 -5832 x 3272 cc: Cavalier Country Bank c/o BB &T Property Tax Compliance P.O. Box 167 Winston - Salem, NC 27102 -0167 File