Loading...
HomeMy WebLinkAboutSDP201000060 Review Comments Final Site Plan and Comps. 2010-10-01Megan Yaniglos From: DeNunzio, Joel D., P.E. [ Joel .DeNunzio @VDOT.virginia.gov] Sent: Friday, October 01, 2010 9:44 AM To: Megan Yaniglos Cc: Philip Custer Subject: SDP - 2010 -00060 Luckstone Entrance Follow Up Flag: Follow up Flag Status: Flagged SDP - 2010 -00060 Luckstone Entrance Megan, VDOT has reviewed the referenced site plan and all previous comments have been adequately addressed. A Land Use Permit will be required for construction within the Route 250 Right of Way. Also, please have the applicant submit a schedule for the start and completion date of the project so VDOT can coordinate the construction of the proposed traffic signal. Thanks Joel Joel DeNunzio, P.E. VDOT Culpeper Land Development 434 - 589 -5871 joel. den unzio@vdot.virginia.aov