Loading...
HomeMy WebLinkAboutWPO201000060 Review Comments Bond Estimate 2010-10-11BOND ESTIMATE - EROSION CONTROL PROJECT NAME: PROJECT NUMBER: DATE OF ESTIMATE ESTIMATE BY: BASED ON: Animal Wellness W PO- 2010 -00060 10/11/10 PBC Plan submitted 10 -7 -2010 WATER ITEM DESCRIPTION UNIT QUANTITY UNIT COST ITEM TOTAL SEED, FERTILIZE, MULCH ACRE 0.99 1500 1485 SILT FENCE LF 160 5 800 TREE PROTECTION FENCE LF 180 3 540 DIVERSION DIKE LF 120 3 360 SEDIMENT TRAP 1 ACRES 0.98 1000 980 CULVERT INLET PROTECTION EA 1 500 500 OUTLET PROTECTION EA 1 200 200 PAVED CONSTRUCTION ENTRANCE EA 2 2000 4000 subtotal project management subtotal CONTINGENCY TOTAL BOND AMOUNT REQUIRED 8865.00 1329.75 10194.75 LS 10% 1019.48 11214.23 11300.00 last revised:12 -5 -01