Loading...
HomeMy WebLinkAboutSDP201000078 Review Comments Final Site Plan and Comps. 2010-10-28vIRGIN� County of Albemarle Department of Community Development Memorandum To: Scott Collins, Collins Engineering Cc: Uptown Village LLC United Land Corporation of America From: Elizabeth M. Marotta, Senior Planner Division: Zoning & Current Development Date: October 28, 2010 Subject: SDP - 2010 -78 Hollymeade Town Center Apartments- Final Site Plan 1. [32.6.6] The final site plan shall reflect the conditions of preliminary approval. Please address the conditions of preliminary approval. The scope and detail of final site plan review is severely limited without the information required. While I am happy to review whatever you formally submit, true progress cannot be made without the benefit of having all required information. 2. [32.5.6.a] The proffers provided on the cover sheet are not the correct version. Please refer to the proffers on the cover sheet of the approved preliminary plan. The comment provided in the preliminary approval letter is below and applies to the proffers as they appear on the preliminary site plan: ... for clarity, just provide the proffers themselves; the extra minutes from the Board of Supervisors meeting are unnecessary and make it difficult for the average reader to readily pick out what the proffers are. Also, please revise the SP reference to SP 93 -14. In my last letter I referred to it as 92 -14 and this was a typo. 3. [32.5.6.a] Prior to Final site plan approval, Albemarle County must sign off on the affordable housing proposed for density bonuses and all necessary documents must be provided pursuant to applicable sections of the code. You are encouraged to begin the process, since the density of your project depends on the approval of the affordable housing. Please contact Scott White with Albemarle County Housing, at 434 - 296 -5839. 4. [32.5.6.a] [32.5.6.e] Prior to final site plan approval you must demonstrate that the "wooded area" for which you are claiming a density bonus meets the definition provided in Section 18 -3.1 "wooded area." A signed letter from an arborist and a Conservation Plan will be required. With adjustments to the clearing limits that may be required for E &S, the limits of the preserved wooded areas may change. You are highly encouraged to do this prior to your next submittal. 5. [32.5.6.1, o] Town Center Drive must be dedicated prior to final site plan approval. [32.5.6.b] Please provide a parking schedule that breaks parking down by required/ provided/ handicap for each phase. A parking note is provided, however it needs to reflect required parking for each phase as well as overall, and the phasing information related to parking should be with the overall parking info. A parking schedule would be the simplest, cleanest way to present the information and to ensure compliance with each phase (and any revisions that may come.) I see that the phasing info for phase I is in the "phasing" notes, but for the reasons noted above, please move it to the parking schedule. As a side note, I count 233 spaces in phase I, not 181 as stated. Please ensure accuracy of data, and remember that parking in each phase must be able to stand alone. 7. [32.5.6.c, n] Phasing must be addressed, as recreational requirements proposed do not match those approved in the 6/11/10 recreation substitution request approval letter (nor do they match the minimum requirements set forth in the code.) Please ensure that all information/data is consistent. Currently, the information related to recreation in the "phasing" and "recreation requirement" notes is not consistent. Please consider presenting phasing information in a chart. Comment #5 could be incorporated into this chart as well. 8. [32.5.6.j,1] Engineering and ACSA approval is required. Please coordinate directly with those offices and provide this office (me) with evidence of tentative approval, once obtained. 9. [32.5.6.n] An outdoor lighting plan is not required if you have no outdoor lighting, however please keep in mind that any outdoor lighting provided is subject to review and approval, including verification that all fixtures are full cutoff and less than 3000 lumens. Outdoor lighting that is installed and has not been approved is subject to violation, and a site plan amendment may be required. 10. [32.5.6.q] Chapter 527 traffic study required by VDOT and Engineering must be submitted and approved prior to final site plan approval. The results of this may affect site design, so you are encouraged to submit that as soon as possible. 11. [32.6.6.a] Specifications for recreation facilities. You must provide a detailed list of the recreation facilities that will be provided (especially within the tot lot.) Please be sure to address groundcover as well. 12. [32.6.6.f] Signature panel is required. Please add one to the cover sheet. 13. [32.6.6.g] Please ensure all dimensions are properly aligned with their intended target. Parking stall dimensions are not lined up properly in some cases. 14. Fire and Rescue approval is required. 15. VDOT approval is required. 16. [32.5.6] Provide graphic scale, especially on landscape plan. 17. [32.7.9.7.a] Provide parking setback on landscape plan. Note that planting must be within parking setback (between parking setback line and right of way.) 18. [32.7.9.7.b] Interior parking regulations are based on parking and vehicular circulation area. The landscaping sheet says 130,631 SF, while the cover sheet says 123,150 SF. A complete review of the requirements of this section cannot be completed until reliable data is provided. Please revise the plan and ensure that the square footages are correct. 19. [32.7.9.7.c] Where parked cars will be visible from the public street, additional landscaping of low street shrubs are required 5' o.c. Please revise to address this requirement. 20. [32.7.9.9.b3] Tree canopy for residential projects of a density of 10 -20 units per acre is 15 %. Please revise landscape plan accordingly. 21. [32.7.9.9.c] When revising the tree canopy calculations, be sure to be clear about what land area 2 deductions are made per this section. (Rec area, open space, preservation areas, etc...) 22. [32.7.9.7.d] If you are claiming a canopy bonus per this section, please show calculations explicitly on the plan. 23. [32.7.9.6] Provide street tree calculations on the landscape plan. I understand the calculations to be as follows, however this would not be apparent to others looking at the plan. Please provide the calculations you used on the plan to illustrate compliance. 925' of frontage. 500'150' (large req. is 1 per 50') = 10 large trees (10 provided) 925'-500= 425' 425' / 40' (medium req. is 1 per 40') = 10 req'd med. trees (18 provided) Please contact Elizabeth Marotta at the Department of Community Development 296 -5832 ext. 3432 if you have any questions or concerns.